Replacement Of Chuck; Replacement Of Jaws - Central Machinery 93212 Set Up And Operating Instructions Manual

7” x 10” precision mini lathe
Hide thumbs Also See for 93212:
Table of Contents

Advertisement

setting, and letting it run for several
minutes at each setting before increasing
to the next level. Continue until you've
run the Lathe all the way up to the
highest setting.
11.
Turn the Power Switch OFF and wait for
the Lathe to come to a complete stop.
12.
Repeat the process with the H/L Gear
Shift Lever at the High setting. Then
repeat at both the Low, then High setting
with the Forward/OFF/Reverse Switch in
the Reverse position.
Warning: the Mini Lathe Must Be
coMPLeteLY stoPPed BeFore
changing the ForWard/oFF/
reVerse sWitch (181), the Feed
direction seLector (35), or the
gear shiFt LeVer (33).
13.
Turn the Power Switch off, the Speed
Control Knob to 0 and unplug the Lathe.
14.
Check the Compound Rest Crank (86b)
and the Cross Slide Crank (86a) to see
that the Compound Rest (105/108) and
Cross Slide work properly. If they are
too tight or too loose, adjust the Gibs
(94/107) located at both crank sides (See
Gib Adjustments in the Maintenance
Section of this manual).
reV 10b
SKU 93212
For technical questions, please call 1-800-444-3353.

replacement of chuck

Figure 13
1.
When replacing the Chuck, place a cloth
or a piece of wood on the bedway at the
bottom of the chuck. This step will help
avoid damage to the bedway caused by
accidentally dropping the chuck.
2.
To replace the chuck, loosen the 3 Nuts
(6) as shown in Figure 13, remove the
old Chuck and replace with a new chuck.
Replace and tighten the Nuts.

replacement of Jaws

External Jaw Set (166)
Insert this
end first
Figure 14
The Lathe comes with two sets of
Jaws: an External Jaw Set (166) and
an Internal Jaw Set (168). Each piece
is numbered and fits into the Chuck
grooves with the corresponding number
Chuck (2)
Spindle (3)
Nut (6)
Internal Jaw Set (168)
Number
Page 15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents