SPYKER 76-22 Operation Manual Service Manual Parts List page 5

Spreading chart
Table of Contents

Advertisement

Walk Behind Frame Assembly
5.
Attach On/Off
Control Lever (13)
to T-Handle
assembly using 2
bolts (32) and
nuts (33).
7
Rate Dial Adjustment
New Linkage Adjustment Procedure
1. Set regulator dial to 1.
2. Set lever completely to off
position.
3. Attach cable clamp (59) to
ground prop with 1
1
/
" bolt
4
and nut and finger tighten.
4. Route cable through clamp,
then through swivel and then
tighten the cable clamp bolt
just enough to allow the cable
to slide back and forth easily.
5. Adjust sheath on cable so there is a 1/8" inch of control wire that
is visible between the sheath and the edge of the rate gate linkage.
6. Tighten the cable clamp bolt to secure the sheath.
7. Tighten the screw on the cable fastener to anchor the wire, making
sure that the rate gate linkage is pushed up against the dial.
8. Trim excess wire behind cable fastener connector when finished
(if necessary).
Dial Setting Information
The RATE DIAL has 9 numbers with 10 stops
between each number, for accurate control of
the spreading rate.
The dial is set with only a turn. It will automati-
cally lock into the set position. LINE UP THE
DIAL NUMBER WITH THE DIAL INDICATOR.
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

78-2298-2296-22

Table of Contents