Samsung MIM-B17 User Manual page 78

Data management server2, bacnet gateway, lonworks gateway for air conditioner
Hide thumbs Also See for MIM-B17:
Table of Contents

Advertisement

EHP Power Consumption Inspection (Continued)
Setting and Checking Watt-Hour Meter
Click [EHP Power Consumption Inspection]  [Setting and checking watt-hour
1
meter] when DMS2 web page menu screen appears.
 Setting watt-hour meter is possible only when SIM/PIM is installed.
Click [Edit] when the setting and checking watt-hour meter screen appears.
2
 CT proportion '1' is set as default.
Set name and CT proportion of watt-hour meter.
3
 You can use maximum 16 letters.
 The range of CT proportion value is positive number from 1 to 5000.
Click [Save].
4
 Set watt-hour meter information will be saved in DMS2.
 If you do not click [Save], changed setting will not be saved.
 Watt-hour meter value shows actual value of currently connected watt-hour meter.
Watt-hour meter value will be updated automatically.
When using CT watt-hour meter, be careful that there can be difference with actual
power consumption as much as CT ratio error.
78
E-

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mim-b18Mim-d00a

Table of Contents