Maytag MEDB700BW0 Installation Instructions Manual page 11

Electric dryer
Table of Contents

Advertisement

5, Connect
remaining
wires
Place hooked ends of remaining direct wire cable wires
under outer terminal block screws (hooks facing right).
Squeeze hooked ends together and tighten screws. Finally,
reinsert tab of terminal block cover into slot of dryer rear
panel. Secure cover with hold-down screw. Now, go to
"Venting Requirements."
3=wire Direct Wire Connection
Use where local codes permit connecting cabinet-ground
conductor
to neutral wire.
1, Prepare your 3-wire cable for
direct
connection
Direct wire cable must have 5 ft. (1.52 m) of extra length so
dryer may be moved if needed.
Strip 31/2" (89 mm) of outer covering from end of cable. Strip
insulation back 1" (25 mm). If using 3-wire cable with ground
wire, cut bare wire even with outer covering. Shape wire ends
into hooks.
Place hooked end of neutral wire (white
or center) (C) of direct wire cable under
center terminal block screw (B). Squeeze
hooked end together. Tighten screw.
4,
Connect
remaining
wires
Place hooked ends of remaining direct wire cable wires
under outer terminal block screws (hooks facing right).
Squeeze hooked ends together and tighten screws. Finally,
reinsert tab of terminal block cover into slot of dryer rear
panel. Secure cover with hold-down
screw. Now, go to
"Venting Requirements."
Optional
3=wire Connection
You must verify with a qualified
electrician that this grounding
method is acceptable before connecting.
ground
wire and neutral
wire
Remove center terminal block screw (B).
Remove center terminal block screw (B). Remove neutral ground
wire (E) from external ground conductor screw (A).
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents