2 TO 5 TON 41/2" Detail BASE PAN - CHASSIS 42-3/4"* BASE RAIL 46-1 !8"* --" 12-1/4 Condensate Drain SUPPLY 12-1/4 1-3/4 RETURN 1-9/16 2-3/16 2-3/16 3-3/4 UNIT SIZE 2 Ton 29-1/2 47-1/2 47-1/2 9-1/2 4-1/2 2-1/2 TO 5 Ton 37-1/2 47-1/2 47-1/2...
Minimum Clearances to Combustible Construction 2. SAFE INSTALLATION REQUIREMENTS Duct Side ....2" (6" on large chassis models) Condenser Inlet ........30" Blower Service (Side) ....... 30" FIRE AND ELECTRICAL SHOCK HAZARD Control Service Side (Front Combustion Air Inlet) ....30"...
reinforced. Check the weight of the unit in relation to the roof FIGURE 2 Condensate Drain Information* structure and local building codes or ordinances and reinforce roof structure if necessary. - Support for the unit MUST be level and strong enough 3/4"...
4. ELECTRICAL WIRING 2. Connect ground lead to chassis ground connection. 3. Connect L1 to pressure lug connection 11 of the compressor contactor. 4. Connect L2 to pressure lug connection 23 of the ELECTRICAL SHOCK HAZARD. compressor contactor. Failure to follow this warning could result in personal Thermostat / Low Voltage Wiring injury, death and/or property damage.
1 x 20" x 24" 1 x 15" x 20" PAF336000K00A1 15"x20" 1 x 18" x 20" PAF342000K00A1 18"x20" 1 x 20" x 20" PAF348000K00A1 2 x20"x20" 1 x 20" x 24" PAF354000K00A1 2 x20"x24" 1 x 24" x 24"...
7. START-UP PROCEDURES operation. When heating demand is met, W3 and W2 sequentially de-energize shutting the indoor fan and the electric heater. CHECK BEFORE STARTING 1. Check that the blower motor speed terminal block is Heating Operation (048 - 054): running the correct heating and cooling speeds.
Page 9
ANNUAL MAINTENANCEANDINSPECTION 3. Remove the two red wires attached to the limit switch and remove the limit switch. Motor removal and replacement ELECTRICAL SHOCK HAZARD. This method is required to replace or repair blower wheel, blower housing, or any unreachable components behind Failure to follow this warning could result in personal blower assembly.
Page 10
Control Box FIGURE Control Plate Capacitor Strap Run Capacitor Motor Board Transformer...
R GG NG INSTRUCTIONS fAiLURE TOfOLLOW - _-SE _.STRUC-r_O_S WA_\ RESULT IN PROPERTY DAMAGE, BoD,_,_u_R_ oRDEAT_ - ALL PANELS MUST IN PLACE WHEN RIGGING LIFTING. - HOOK RIGGING SHACKLES THROUGH HOLES IN BASE RAIL, SHOWN IN DETAIL-A. - USE SPREADER BARS, WHEN RIGGING,...