Kenmore 721.80402 Installation Instructions Manual page 18

Hide thumbs Also See for 721.80402:
Table of Contents

Advertisement

STEP 6:
ATTACH
THE OVEN TO
THE WALL
5. Roof vented installation: See Figure 32.
Install ductwork through the vent opening in the
upper cabinet. Complete the venting system through
the roof according to the method needed. See
"PREPARE THE VENTING SYSTEM," STEP 2 on
the page 8. Use caulking to seal exterior roof
opening around the exhaust cap. See Figure 6 on
page 8.
6. Use power supply cord clamp to bundle the power
supply cord. Install the power supply cord clamp,
using a screw as shown in Figure 33, to inside of
the cabinet.
7. To install the grease filter: Slide it into the slide slot,
then push up and toward oven center to lock.
See Figure 34.
8. Plug in the power supply cord.
9. Read your Owner's Manual, then check the
operation of your microwave oven.
i
damper
Ji_l
Figure 32
i
I
I 1-':-1 !_\lil I ,,power
i
I
I1©1
}_WI supply
i
I
I_=_ J J/ I cord
clamp
Figure 33
L..j
Figure 34
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents