Test 54: Check Idle Control Transformers; Test 55: Check Tr1 & Tr2 Wiring - Generac Power Systems 4451 & 4986 Repair Manual

Ultra source portable generator
Table of Contents

Advertisement

section 6
Diagnostic tests
SW2
83
0
J2-1
J2 HARNESS CONNECTOR
Figure 6-60. – Check Idle Control Wiring
RESULTS:
Repair or replace wiring as needed. Refer back to the
flow chart.
TEST 54 - CHECk IdLE CONTROL
TRANSFORMERS (ICT)
PROCEDURE:
1. Set a voltmeter to measure resistance.
2. Remove the two Idle Control Transformer (ICT) Wires from
Terminal Block 1 (TB1). See Figure 6-61.
3. Connect one meter test lead to one wire and connect the other
meter test lead to the other wire. Approximately 100 ohms
should be measured. If resistance is not measured repair or
replace the Idle Control Transformers. If resistance was mea-
sured proceed with Step 4.
4. Set a voltmeter to measure AC Voltage.
5. Connect one meter test lead to one wire and connect the other
meter test lead to the other wire.
6. Turn the Idle Control Switch (SW2) to OFF. The generator
should be running at about 60 HZ.
Page 64
00.00
J2-12
MAKE SURE THE TEST
PROBE CONNECTOR IS
MAKING CONTACT
WITH THE CONNECTOR.
DOUBLE CHECK TO
MAKE SURE THAT THE
TIP IS SHARP.
7. Apply a light load to the generator, such as a electric drill.
8. When the drill is activated measure the voltage output. The AC
voltage should measure around 1-2 VAC.
RESULTS:
Refer back to flow chart.
86
15B
167
0
229
83
TERMINAL
BLOCK
(TB1)
Figure 6-61. Check Idle Transformer Wiring
TEST 55 - CHECk TR1 & TR2 WIRINg
86
15B
167
0
229
83
TB1
J2-1
J2 HARNESS CONNECTOR
Figure 6-62. – Check TR2 Wiring
BLK
BLK
100 ohm
TR2
TR1
BLK
BLK
00.00
TR2
TR1
J2-12
MAKE SURE THE TEST
PROBE CONNECTOR IS
MAKING CONTACT
WITH THE CONNECTOR.
DOUBLE CHECK TO
MAKE SURE THAT THE
TIP IS SHARP.