Initial Power Up, Calibration, And Registration (Ac Power Applied) - Cisco DPC3008 User Manual

8x4 docsis 3.0 cable modem
Hide thumbs Also See for DPC3008:
Table of Contents

Advertisement

Chapter 3 Operation of Front Panel Indicators
Initial Power Up, Calibration, and Registration (AC
Power applied)
The following chart illustrates the sequence of steps and the corresponding
appearance of the cable modem front panel LED status indicators during power up,
calibration, and registration on the network when AC power is applied to the cable
modem. Use this chart to troubleshoot the power up, calibration, and registration
process of your cable modem.
Note: After the cable modem completes Step 7 (Data Network Registration
Complete), the cable modem proceeds immediately to Normal Operations. See
Normal Operations (AC Power applied) (on page 17).
Front Panel LED Status Indicators During Initial Power Up, Calibration, and
Registration
Step:
Front Panel
Indicator
1
POWER
2
DS
3
US
4
ONLINE
5
LINK
16
High Speed Data Registration
1
2
3
Self
Downstream
Downstream
Test
Scan
Signal Lock
On
On
On
On
Blinking
On
On
Off
Off
On
Off
Off
On
On or Blinking
On or Blinking
4
5
Ranging
Requesting IP
Address
On
On
On
On
Blinking
On
Off
Off
On or
On or Blinking
Blinking
6
Request High Speed
Data Provisioning
File
On
On
On
Blinking
On or
Blinking
4022345 Rev B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Epc3008

Table of Contents