RBI SERIES 8800 Installation & Operation Manual page 19

Gas boilers (model hb) & water heaters (model hw)
Table of Contents

Advertisement

SERIES 8800 & 8900 INSTALLATION AND OPERATING INSTRUCTIONS
Figure 10 - Typical Water Heating Piping (HW Models Only)
(See Notes)
3
8
Figure 11 - Multiple Water Heating Piping (HW Models Only)
(See Notes)
6
1
NOTES:
1. Optional cold water make up and recirculation line location.
2. When using intermittent pump and pump delay, locate remote aquastat well in lower 1/3 of tank. Install aquastat with heat sensing compound.
3. Thermal expansion tank may be required, check local codes.
4. When using optional factory mounted pump, max pipe length 30' total, 6-90° elbows, full pipe size.
5. CAUTION: MEASURE WATER HARDNESS AND pH AT JOB SITE.
The pH and water hardness must be measured before selecting heat exchanger and pump. Consult the Heat Exchanger Graph and
Pumping Performance Table before making selection.
6. Common piping must be sized for maximum combined heater flow.
7. Hot water tanks should be equipped with a combination temperature & pressure relief valve.
8. MA Code requires an 1/8" hole in check valve to compensate for thermal expansion.
Notice: These drawings show suggested piping configuration and valving.
Check with local codes and ordinances for specific requirements.
1
4
7
2
Attention:
RBI stock storage tanks do not
incorporate this tapping: See Note 1.
3
8
7
2
7
2
D-1 Rev 5
4
4
6
D-4 Rev 5
Attention:
RBI stock storage tanks do not
incorporate this tapping: See Note 1.
Page 19
Pump
Valve
Globe Valve
Angle Valve
Bufferfly Valve
Balance Valve
Ball Valve
Motorized Valve
Solenoid
Operated Valve
Self-Operated
Valve
Pressure
Reducing Valve
Check Valve
Pressure
Relief Valve
Flow Switch
Thermometer
Aquastat Union
Pressure Switch
Gas Pressure
Regulator
Automatic
Air Vent
Temperature &
Pressure
Relief Valve
Vacuum
Relief Valve
Drain Valve
(Typ.)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents