Mitsubishi Electric Central Controller G-50A Operation Manual page 11

Building air-conditioner control system
Hide thumbs Also See for Central Controller G-50A:
Table of Contents

Advertisement

3-3-2 Adjusting the operation conditions that target all groups
(1) Click [Batch Operation] from the operation condition monitoring
screen that displays all groups in a list. When air conditioner
groups, ventilator (LOSSNAY) groups, and general equipment
groups exist together in the List, a new screen will appear to
select the group. Click one of the [All air-conditioners], [All
LOSSNAY], or [Other Equipment] and the screen to set the batch
operation will appear.
If there is only air conditioner groups or only LOSSNAY groups or
only general equipment groups, this selection screen will not
appear.
(2) After you have made the settings on the screen for batch
operation, click [OK] and only the items for which operation was
performed will be sent to all the air conditioner units. To return to
the previous screen without performing any operations, click
[Cancel].
Note: If the setting range for set temperature is restricted, the temperature
setting range will be smaller.
Note: If operation of an item has been prohibited, then operation is not
possible for that item.
10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Central controller gb-50a

Table of Contents