B. Install Fireplace & Chimney
Install as per Sections 7 and 8.
C. Install Chase Top
•
You MUST use a chase top in a chase installation. Chase
tops are available from your Heat & Glo dealer or may be
field constructed.
•
Include a turndown and drip edge to prevent water from
seeping into the chase.
•
Include a 2 in. (51 mm) soldered, caulked or spun collar
around pipe opening to keep water out.
•
Provide a 1/8 in. (3 mm) gap around the flue pipe.
•
Slope the chase top downward away from the opening.
CAUTION! Do not caulk the pipe to the chase top collar.
•
Caulk all seams to prevent leaks.
•
Refer to Figure 9.4.
Heat & Glo • RUTHERFORD-42 • 4059-309 Rev L • 5/11
Slope Downward
(1/4 in. per foot
minimum)
Figure 9.3
Chase Top Construction
2 in. (51 mm) Collar
on Chase Top
Turn-down
Drip Edge
Chase
.018 (26 ga) min.
Galvanized
Chase Top