1.6
Space requirements
1.6
Space requirements
To ensure that machine operation, consumables replenishing, part replacement, and regular maintenance
can easily be performed, adhere to the recommended space requirements detailed below.
25-7/8 (658)
5-7/8
(150)
4-3/16
(107)
NOTICE
Be sure to allow a clearance of 200 mm (8 inches) or more at the back of this machine for the ventilation duct.
VL3622c/VL2822c/VL2222c
64-15/16 (1649)
39 (991)
VL3622c/VL2822c/VL2222c+DF-617+PC-207+FS-527+SD-509
52-9/16 (1335)
7-5/8
39 (991)
(194)
VL3622c/VL2822c/VL2222c+DF-617+PC-207+FS-529
53-7/16 (1358)
14-3/8
34-7/8 (886)
VL3622c/VL2822c/VL2222c+DF-617+PC-207+JS-505+MK-713
(365)
57-5/8 (1463.2)
12-5/8
(321)
43 (1092.2)
Unit: inch (mm)
57-5/8 (1463.2)
12-5/8
(321)
43 (1092.2)
Unit: inch (mm)
57-5/8 (1463.2)
12-5/8
43 (1092.2)
(321)
Unit: inch (mm)
1
1-15