SD275
Standby Power Rating
344kVA 275kW 60Hz
Prime Power Rating*
310kVA 248KW 60Hz
*EPA Certified Prime ratings are not available in the U.S. or its Territories for engine model year 2011 and beyond
primary codes and standards
features
Generator Set
= PROTOTYPE & TORSIONALLY TESTED
= UL2200 TESTED
= RHINOCOAT PAINT SYSTEM
= WIDE RANGE OF ENCLOSURES AND TANKS
Engine
= EPA COMPLIANT
= INDUSTRIAL TESTED, GENERAC APPROVED
= POWER-MATCHED OUTPUT
= INDUSTRIAL GRADE
Alternator
= TWO-THIRDS PITCH
= LAYER WOUND ROTOR & STATOR
= CLASS H MATERIALS
= DIGITAL 3-PHASE VOLTAGE CONTROL
Controls
= ENCAPSULATED BOARD W/ SEALED HARNESS
= 4-20mA VOLTAGE-TO-CURRENT SENSORS
= SURFACE-MOUNT TECHNOLOGY
= ADVANCED DIAGNOSTICS & COMMUNICATIONS
Industrial Diesel Generator Set
EPA Certified Stationary Emergency
Generator image used for illustration purposes only
benefits
PROVIDES A PROVEN UNIT
4
ENSURES A QUALITY PRODUCT
4
IMPROVES RESISTANCE TO ELEMENTS
4
PROVIDES A SINGLE SOURCE SOLUTION
4
ENVIRONMENTALLY FRIENDLY
4
ENSURES INDUSTRIAL STANDARDS
4
ENGINEERED FOR PERFORMANCE
4
IMPROVES LONGEVITY AND RELIABILITY
4
ELIMINATES HARMFUL 3RD HARMONIC
4
IMPROVES COOLING
4
HEAT TOLERANT DESIGN
4
FAST AND ACCURATE RESPONSE
4
EASY, AFFORDABLE REPLACEMENT
4
NOISE RESISTANT 24/7 MONITORING
4
PROVIDES VIBRATION RESISTANCE
4
HARDENED RELIABILITY
4
1 of 5
Need help?
Do you have a question about the SD275 and is the answer not in the manual?
Questions and answers
Where do I connect the two wires from transfer switch to turn on the generator for auto operation
The Generac Power Systems SD275 generator is 2-wire start compatible, meaning it can be connected to a transfer switch using two control wires for automatic operation. To connect the two wires:
1. Locate the 2-wire start terminals on the generator's control panel.
2. Connect the two control wires from the transfer switch to these terminals.
3. Ensure the transfer switch is properly configured to send a start signal when utility power fails.
4. Verify the generator and transfer switch settings for correct operation.
5. Test the system by simulating a power outage to confirm automatic start and transfer.
For detailed wiring diagrams, consult a Generac Industrial Dealer.
This answer is automatically generated