Jacuzzi Vantage Installation Instructions Manual

Whirlpool bath with surround

Advertisement

Quick Links

Each whirlpool bath is arrives ready for installation, completely equipped with motor/pump assembly and plumbing
and fittings necessary for whirlpool operation. An optional drain/overflow kit is available for installation on the bath.
32''
18-1/2"
END VIEW WITHOUT
BODY SPRAY JETS
SPECIFICATIONS
DIMENSIONS
MOTOR/PUMP
60"
(1524 mm) L
115 VAC
32"
( 813 mm) W
3450 RPM/10 AMP
84-1/2" (2146 mm) H
60 Hz
Single Phase
Use installation instructions provided with product.
Optional Features: Trim Kit, Timer, Drain/Overflow Kit, Lamp Package, Pillow, Optica 300
Shower Mixer Valve and SteamPro™ 120 Steam Generator
Vantage

INSTALLATION INSTRUCTIONS

32''
84-1/2''
18-1/2"
END VIEW WITH
BODY SPRAY JETS
TOTAL
WEIGHT/
FLOOR
OPERATING
LOADING
GALLONAGE
805 lb
38 U.S. gal
(366 kg)/
(144 liters)
60 lb/sq. ft.
(293 kg/sq. m)
Whirlpool Bath
with Surround
14-1/2''
9-3/8''
SIDE VIEW
PRODUCT
WEIGHT
238 lb
(108 kg)
Product specifications are subject to change without notice.
60''
24-1/2''
WATER
ELECTRICAL
PRESSURE
REQUIREMENTS
40 psi min.
115 VAC
(2.8 Bar)
15 AMP
60 Hz
Requires dedicated
separate circuit
24''
36''

Advertisement

Table of Contents
loading

Summary of Contents for Jacuzzi Vantage

  • Page 1: Installation Instructions

    ™ Vantage Whirlpool Bath with Surround INSTALLATION INSTRUCTIONS Each whirlpool bath is arrives ready for installation, completely equipped with motor/pump assembly and plumbing and fittings necessary for whirlpool operation. An optional drain/overflow kit is available for installation on the bath.
  • Page 2: Framing And Support

    Immediately upon receipt, inspect the shell before installing. Should inspection reveal any damage or defect in the finish, do not install the bath. Damage or defect to the finish claimed after the bath is installed is excluded from the warranty. Jacuzzi Whirlpool Bath's responsibility for shipping damage ceases upon delivery of the products in good order to the carrier.
  • Page 3: Installation

    Rough Plumbing HEADER SHEET The locations of the valves, fill spout and shower head ROCK DETAIL should be marked and drilled before the bath unit is INSERT placed in position. Where access to connections is limited, allow enough flexibility in the supply lines for 2"...
  • Page 4 OPTICA 300 CONNECTIONS ROUGH-IN PLUMBING DETAILS TO SHOWER TO BODY BLOCKING SPRAY JETS (IF NOT EQUIPPED, PLUG OFF) OPTICA 300 MIXER AND TRANSFER TRANSFER VALVE (FOR FIXED VALVE SHOWER TO FILL HEAD) SPOUT HOT IN COLD IN 32" MIN. 42" MAX. MIXER VALVE LINE FOR BODY SPRAY JETS...
  • Page 5: Service Access

    If installation of an optional timer is desired, refer to ELECTRICAL wiring instructions provided with the timer. An optional 3 PRONG CONNECTION PLUG timer is available from Jacuzzi Whirlpool Bath for 115 VAC operation. DUPLEX Plumbing RECEPT.* Pump, jets and suction fittings for the whirlpool sys- tem are factory plumbed in PVC schedule 40 piping.
  • Page 6: Drain Information

    USE INSTALLATION INSTRUCTIONS SUPPLIED WITH PRODUCT. Jacuzzi Whirlpool Bath has obtained applicable code (standards) listings generally available on a national basis for products of this type. It is the responsibility of the installer/owner to determine specific local code compliance prior to installation of the product.
  • Page 7 All implied warranties of merchantability and fitness for a particular purpose are equal in duration with the express warranties set forth herein. NOTICE: This warranty gives you specific legal rights, and you may also have other rights which vary from state to state. There are no warranties applicable to Jacuzzi Whirlpool Bath products except as expressly stated herein or as implied by applicable state and federal laws.
  • Page 8 The Company will provide the warranty service described above when the following conditions have been met: the failure is of the nature or type covered by the warranty; the user has informed an Authorized Jacuzzi Whirlpool Bath Service Agent or Warranty Service Department Representative of the nature of the problem during the warranty period;...

Table of Contents