Dear Customer Please read this user manual carefully, paying special attention to the safety notes! Keep the manual in a safe place for later reference, and pass it on to any new owner. Contents Figure captions 10 Changing and Saving the Coffee 1.1 Machine Parts (Fig.
Figure captions Top View (Fig. 2) Cup rack Machine Parts (Fig. 1) Q Opening for ground coffee A Top view (see Fig. 2) with lid (ground coffee filler) B Bean container with lid R Bean-container position setting C Service cover Service cover release button D Selection dial for steam and hot water Release catch for removing grinding...
Coffee and espresso Safety Information Your fully automated coffee machine This appliance corresponds to accepted guarantees you technological standards with regards • Absolute ease of operation, both in to safety and to the German Appliance making coffee and in maintenance and Safety Law.
Page 12
• Do not use steam to heat inflammable Never open or repair the coffee liquids! machine. Faulty repairs can result in considerable hazard to the user. • Only use the coffee machine with water in the system! Fill the water tank Repairs to electrical appliances must be with cold water.
0 Remove the water tank from the cof- Using for the First Time fee machine (Fig. 7). Setting Up and Connecting the 0 Fill the water tank with fresh cold Coffee Machine water (Fig. 8). Place machine on a suitable horizontal, Pour only fresh cold water in the water stable, unheated and water-resistant tank.
Switching the Coffee Machine Setting and saving the water hardness level You can set 4 hardness levels. The cof- If you switch the coffee machine off fee machine is factory-set to hardness with the "On/Off" key (Fig. 3, f) level 4. after you have finished making coffee, 0 With the machine switched on, turn the the machine carries out a flush pro-...
Ensure that you use only pure coffee Notes on changing the cup measures beans with no caramelised or aroma- can be found in „Changing and Saving tised additives. Do not use frozen the Cup Measure" on page 37. beans. Selecting the Coffee Quantity Filling the Coffee Bean 0 Repeatedly press the "Coffee Quantity"...
In the coffee-making process, the Select Cup Size ground coffee is first of all wetted with Refer to „Select Cup Size" page 35. a small quantity of water for pre- brewing. Following a short pause, the Dispensing Coffee actual brewing process commences. Refer to „Dispensing Coffee"...
Attention! Impurities from dried milk Caution! Danger of burns from the residues in the steam nozzle. Take care frothing aid! Hold the frothing aid only not to immerse the steam nozzle in the by the black seal. milk far enough to cover the air intake opening at the top of the steam nozzle.
0 Repeat the process if you would like to Setting the Grinding change the measures for the other cup Texture symbols. Note! The grinder settings must be The machine switches off automati- changed only while coffee is being cally on reaching the max. Cup Mea- ground.
The coffee temperature levels are indi- Setting the Switch-off cated as follows: Time If the coffee machine is not used for a "lukewarm" set amount of time, it automatically switches off for economy reasons. "warm" You can choose between five switch- off times (automatic switch-off after 1 to 5 hours).
0 Regularly drain the drip tray. This can Resetting the Coffee be done at any time, but must be done Machine when the red Drip tray float (Fig. 1, I) appears through the opening in the This function is used to reset any drip grille.
Always empty the grounds container When refitting the grinding ring, with the coffee machine switched on, ensure that both catches on the grind- otherwise the coffee machine does not ing ring holder engage in the corre- register that the container has been sponding slots (Fig.
The coffee machine can be switched on 0 Remove the service cover. only when the service cover is closed. The coffee-making unit is located After the coffee machine has been behind the service cover (Fig. 29). The switched on, the coffee-making unit three red elements are used for latch- runs through the set-up cycle, and this ing and unlatching.
During the cleaning process, the Phase 1: descaling phase, and Phase 2: "Empty grounds container" indicator flushing phase. (Fig. 3, h) is illuminated, and the In the event of a power failure or Coffee Quantity indicators are illumi- interruption, the program must be nated alternately.
0 Place a suitable cup or jug with a What do I do, if ... capacity of at least 200 ml under the • ... coffee-making is interrupted and hot-water nozzle. the "Fill water tank" indicator (Fig. 3, 0 Turn the Selection dial for steam and flashes? hot water (Fig.
Page 25
• ... the cleaning program cannot be • ... the bean container will not locate started? on the grinder? – Turn the bean container to the pow- – Coffee bean residue on or around the grinder: Remove coffee bean der setting, then start the cleaning program.
• ... the coffee machine has to be Now individual indicator lights start to transported? flash in sequence, showing the number – Keep the original packaging as of cups made: transport protection. It is important 1 x flash corresponds to to use the original film as a protec- 10,000 cups tion against scratches.
If repairs should become necessary, including replacement of the mains Power consumption: 1290-1400 W cable, please telephone in the first instance our AEG-Electrolux Service This coffee machine complies with the Line. following EU Directives: • 73/23/EEEC of 19.2.1973 "Low Voltage Directive", including Amendment Directive 93/68/EEC.