Building In; Building Over A Cupboard Or Drawer; Building Over A Kitchen Unit With Door - AEG 65402 G Instruction Booklet

Hide thumbs Also See for 65402 G:
Table of Contents

Advertisement

20

Building In

Building over a cupboard or drawer

If the hob is to be installed above a cupboard or drawer it will be necessary to fit a heat
resistant board below the base of the hob on the underside of the work surface.
It is also recommended to carry out the electrical connection to the hob as shown in
diagrams 1 and 2.
1
Building over a kitchen unit with
door
Proper arrangements must be taken in designing the
furniture unit, in order to avoid any contact with the
bottom of the hob which can be heated when it is
operated. The recommended solution is shown in
diagram 3.
The panel fitted under the hob ("a") should be easily
removable to allow easy access if technical
assistance is needed. The space behind the kitchen
unit ("b") can be used for connections.
Dimensions are given in mm.
2
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

65852 g

Table of Contents