Kohler 1199249-2-A Installation And Care Manual page 8

Bath with airjets
Table of Contents

Advertisement

Available languages

Available languages

4. Disconnect the Blower Motor - Remote
NOTICE: This section applies only to installations in which the blower motor and check valve are
being relocated.
NOTICE: Do not cut the blower piping for this installation.
NOTICE: You must relocate the check valve with the blower motor. Do not disconnect the check valve
from the tee.
Remove the Blower Motor and Check Valve
Disconnect the blower motor electrical plug from the control.
Remove any cable ties that support the blower motor cord.
Remove and retain the screw holding the check valve to the PVC elbow.
Remove and retain the four screws from the baseboard.
Slide the blower motor and check valve away from the elbow, and remove the blower motor from
the bath.
Prepare the Site
NOTE: Refer to the "Prepare the Blower (Remote Site)" section for blower relocation details.
Prepare the site where the blower motor will be installed. The site must be within 15' (4.5 m) of the
bath.
Install an access panel to service the blower motor.
Prepare the routing paths for the PVC piping and the new blower motor power cable. Follow all
applicable codes.
1199249-2-A
Blower Motor
Mounting Screws
Cover
Junction Box
Baseboard
Elbow
Check
Valve
Screw
Control
To Blower Motor
Blower Motor
Electrical Plug
8
Kohler Co.

Advertisement

Table of Contents
loading

Table of Contents