Wall drilling and bracket fixing

As a first step, proceed with the following drawings:
• a vertical line up to the ceiling or up to the upper limit,
at the centre of the area in which the hood is to be
fitted;
• a horizontal line at a minimum 1004 mm above the
cooker top.
• Mark a point (1) on the horizontal line, 247 mm to the
right of the vertical reference line.
• Repeat this operation on the other side, checking that
the two marks are levelled.
• Mark a reference point (2) as indicated at 210 mm
from the vertical reference line and 482 mm above the
cooker top.
• Repeat this operation on the other side, checking that
the two marks are levelled.
• Drill at the marked points (1), using a ø 12 mm drill bit.
• Drill at the marked points (2) using a ø 8 mm drill bit.
• Insert the bracket plugs 11a into the holes (1) and
tighten the screws.
• Insert plug 11 into holes (2).
To install a decorative chimney ( optional )
• Place bracket 7.2.1 on the wall, about 1-2 mm from
the ceiling or from the upper limit, aligning the centre
(notch) with the vertical reference line.
• Mark the wall at the centres of the bracket holes.
• Place the bracket 7.2.1 on the wall at X mm below the
first bracket (X = height of the upper chimney section),
aligning the centre (notch) with the vertical line.
• Mark the wall at the centres of the bracket holes.
• Drill ø 8 mm holes at all the marked centre points.
• Insert the wall plugs 11 in the holes.
• Fix the brackets using the 12a screws (4,2 x 44,4) sup-
plied with the hood.
INSTALLATION INSTRUCTIONS
���
INSTALLING THE COOKER HOOD
�����
��� ���
���
���
��
17
���
���