GE Profile 200D2600P039 Owners And Installation Manual page 31

Models 23, 25, 26, 27 and 29
Table of Contents

Advertisement

Available languages

Available languages

7
REPLACE THE BASE GRILLE
Replace the grille by installing the two
Phillips head screws.
SET THE CONTROLS
8
Set the controls to the recommended
setting.
Installation Instructions
31
9
START THE ICEMAKER
Set the icemaker power switch to the
I (on) position. The icemaker will not
begin to operate until it reaches its
operating temperature of 15°F (–9°C)
or below. It will then begin operation
automatically. It will take 2–3 days to
fill the ice bin.
Power
switch
NOTE:
In lower water pressure conditions, the
water valve may turn on up to 3 times
to deliver enough water to the icemaker.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Profile psss3rgxss26272925

Table of Contents