Ariens Professional 32 - 12 Volt Manual page 11

Owners manual
Table of Contents

Advertisement

Install Discharge Chute, Chute
Control and Chute Rod
(Figures 5, 6 and 7)
1. Grease underside of discharge chute
ring (if not already greased).
2. Remove mounting hardware from auger
housing.
3. Install discharge chute over opening in
the auger housing. Finger tighten the
mounting hardware removed in step 2.
NOTICE: Leave discharge chute pedestal
loose to help install the chute rod.
3
1. Mounting Holes
2. Discharge Chute
3. Discharge Chute Ring
4. Chute Pedestal
5. Mounting Hardware
Figure 5
4. Remove the gear cover from top of
chute pedestal.
5. Release the lock teeth on the gear
assembly with your finger and rotate the
discharge chute so it points straight
ahead.
NOTICE: Make sure alignment markers are
lined up when discharge chute is pointing
straight ahead.
6. Remove rubber grommet from control
panel.
7. Make sure the chute control cable is
3
1
2
2
4
4
5
8. Reinstall rubber grommet over control
EN - 11
routed between the lower handlebar and
the bottom of the control panel, insert
control assembly into slot in control
panel from below and install assembly
into nylon bushing in control panel.
1
2
5
3
1
1. Control Assembly
2. Nylon Bushing
3. Push Nut
4. Socket Extension (Optional)
5. Socket, 3/4"
Figure 6
assembly knob and into control panel.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents