Saunier Duval Xeon 30ff Instructions For Use Installation And Servicing page 7

Fanned flue boiler (s.i.t.)
Table of Contents

Advertisement

1.12 Boiler Clearances
Refer to diagram 1.3.
This boiler must be positioned so that at least the minimum
operational and servicing clearances are provided.
Additional clearances may be required for installation.
If fixtures are positioned next to the boiler they should be made
removable for access to pipework.
At least a minimum clearance of 500mm must be left in front of
the boiler for servicing, see diagram 1.3.
1.13 Room Ventilation
The boiler is room sealed and does not require the room or
space containing it to have permanent air vents.
1.14 Boilers in a Compartment
Where the installation of the boiler will be in an unusual position,
special requirements are needed, the current issue of BS6798
gives detailed guidance on these requirements.
A compartment used to enclose the boiler must be designed
and constructed specifically for this purpose. An existing
cupboard or compartment modified for the purpose may be
used.
Details of essential requirements for cupboard or
compartment design are given in the current issue of BS6798.
The doorway opening should be of sufficient size to allow for
easy removal of the boiler.
Where the boiler is fitted in a cupboard or compartment,
permanent high and low level ventilation must be provided. The
minimum ventilation areas required are given in Table 2.
1.15 Timber Frame Building
If the boiler is to be installed in a timber frame building it should
be fitted in accordance with the Institute of Gas Engineers
document IGE/UP/7/1998. If in doubt seek advice from the local
gas undertaking or Hepworth Heating Ltd.
1.16 Heating System Controls
The heating system should have installed: a programmer and
room thermostat controlling the boiler.
Thermostatic radiator valves maybe installed, however they
must not be fitted in a room where the room thermostat is
located.
Note: For further information, see The Building Regulations
1991 - Conservation of fuel and power, 1995 edition - Appendix
G, table 4b.
1 General Data
6mm
MINIMUM CLEARANCES FROM WALLS,
CEILING, FLOOR, CUPBOARD, WORKTOPS
AND INFLAMMABLE MATERIALS
TABLE 2. COMPARTMENT AIR VENTS
VENTILATION
REQUIREMENTS
VENTILATION
FROM
ROOM
OR SPACE
VENTILATION
FROM
OUTSIDE
7
500mm
Additional clearances may be
required for installation
100mm
FRONT
VIEW
65mm
HIGH LEVEL
VENT AREA
2
2
cm
in
99
15
50
7.5
SIDE OR
REAR FLUE
5mm
5mm
6mm
Diagram 1.3
LOW LEVEL
VENT AREA
2
2
cm
in
99
15
50
7.5
221656D