Restore To Normal Operation After "Total Off - GE Digital Energy LP 33 Series Operating Manual

50 & 60 kva
Hide thumbs Also See for Digital Energy LP 33 Series:
Table of Contents

Advertisement

7.1.5 Restore to normal operation after "total off"

NOTE !
Make sure about UPS status with "total off" activate, & Q1 closed, Q2 open and the
battery breaker Q3 in ON in battery cabinet.
View of the panel after pressing the button "total off":
All Contactors are open.
Booster, inverter and Static-Switch shutdown.
1.
Reset "total off".
Restore the command "total off" by entering the screen:
MENU/RESET TOTAL OFF
The load is supplied by the mains through the automatic
bypass.
The booster starts automatically.
The LCD screen must display the status:
APPLICATION ON BYPASS
2.
Switch ON the inverter by entering the screen:
MENU/COMMAND MENU/INVERTER ON
The LCD screen must display the status:
APPLICATION ON UPS
Modifications reserved
OPM_LPS_3UO_50K_60K_0US_V010.doc
END OF PROCEDURE
LP 33
60kVA
APPLICAT. SUPPLY OFF
= 0%
LED TEST
RESET TOTAL OFF
LP 33
60kVA
APPLICATION ON BYPASS
= xx%
COMMAND MENU
INVERTER ON
INVERTER OFF
LP 33
60kVA
APPLICATION ON UPS
= xx%
Operating Manual LP 33 Series 50 & 60 kVA
*
*