Setup and Installation of the Packaged Cluster
10. Secure the storage system to the rack.
IMPORTANT: Tightening of the shipping bracket is only necessary if the rack is to be shipped
with the Smart Array Cluster Storage system installed.
HP ProLiant DL380 Generation 3 Packaged Cluster Setup and Installation Guide
2-25