HP ProLiant DL380 G3 with MSA1000 Setup And Installation Manual page 36

Packaged cluster
Hide thumbs Also See for ProLiant DL380 G3 with MSA1000:
Table of Contents

Advertisement

4. Slide the back end of the left rack rail into the inside rear of the rack. Be sure that
the pins extend through the holes marked during the rack template procedure.
IMPORTANT: Be sure that the scissor-type locking latches engage when the ends of the rail
seat into the rack uprights.
5. Repeat steps 3 and 4 for the right rack rail.
HP ProLiant DL380 Generation 3 Packaged Cluster Setup and Installation Guide
Setup and Installation of the Packaged Cluster
2-21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant dl380 g3

Table of Contents