4. Operating the Espresso Machine and Preparing Coffee pag 7 5. Preparing Other Hot Drinks pag 9 6. Preventative Maintenance and Weekly Cleaning pag 10 7. De-Commissioning and Demolition pag 11 8. History and Use of the “La Marzocco” Coffee Machines pag 12 www.lamarzocco.com V1.3...
GB/5 - FB/80 2. Definition of Available Models This operating manual refers exclusively to the following models, of our own manufacture: GB/5 or FB/80, Model EE & AV into 2, 3 and 4 groups 1) Common Dimensions, Weights, and Features GB/5 2 gr.
Page 5
2) General Description The machine is built in 2, 3, and 4 group versions and is It consists of a stainless sheet steel body for the GB/5 and essentially composed of the following parts: painted plastic for FB/80. The structure has been the object...
GB/5 - FB/80 3. Installation Electrical Supply Power Connection Supply Cord Waste/Drain Water Pump Motor Power Water Cord Filtration/Softener Water Pump and Motor Expansion Valve Drain Grate Drain Tray Drain Hose Connection Water Supply Connection www.lamarzocco.com V1.3...
Page 7
PVC tubing and suitable hose clamps. HAZARDOUS VOLTAGE DISCONNECT FROM POWER SUPPLY BEFORE SERVICING V1.3 La Marzocco, S.r.l. Firenze, Italia...
GB/5 - FB/80 4. Operating the Espresso Machine and Preparing Coffee 1) Starting the Espresso Machine 2)Waiting for the Espresso Machine to Heat to Operating Temperature Filling the Boilers with Water During this time, it may happen that the pointer of the coffee Once the installation procedures have been completed, it is boiler pressure gauge reaches as high as 14-15 bar.
Page 9
To improve the flavor profile of the espresso, the temperature of the water in the coffee boiler, and therefore of the groups, may eventually be raised or lowered via the digital display (please consult the Software Programming Manual for detailed instructions). V1.3 La Marzocco, S.r.l. Firenze, Italia...
GB/5 - FB/80 5. Preparing Other Hot Drinks 1) Steaming Milk or Other Liquids Dip one of the 2 steam wands (part 8, fig. 1) which are connected to the steam valve, into the liquid to be heated, turn the steam knob (part 9, fig.
Hot Please see the documentation that accompanied the water water nozzles must be cleaned periodically with a damp cloth. filter/softener for the proper operating and cleaning instructions. V1.3 La Marzocco, S.r.l. Firenze, Italia...
GB/5 - FB/80 7. De-Commissioning and Demolition 1) De-Commissioning and Demolition Start by setting the main switch to the “0” or OFF position. Disconnecting from the power outlet Disconnect the espresso machine from the electrical network by switching off the associated circuit breaker or circuit protection device.
The Second World War brought an end to production of coffee 4) Espresso Machine machines, and the fact that La Marzocco was a company of just Among other things, the espresso machine must guarantee the right size (small-medium) allowed it to keep in touch directly the following qualities: with its clients and specialty “cafés”, which meant being able to...
Page 14
-The pressure is displayed by means of a pressure gauge with when compared to other machines. a scale of 0 to 2 bar. The “GB/5” series machines are produced in the 2, 3 and 4 -Safety device, based on an expansion type mechanical valve, group versions.
Page 15
HANDMADE IN FLORENCE 50010 Via Bolognese Pian Di San Bartolo Firenze, Italy t: +39.055.401.390 f: +39.055.401.349 La Marzocco s.r.l. e-mail: florence@lamarzocco.com www.lamarzocco.com...
Need help?
Do you have a question about the GB/5 and is the answer not in the manual?
Questions and answers