INTRODUCTION
Getting to know your Enterprise
This Enterprise has been put through a rigorous and unique testing procedure that ensures that it will last for
many years with minimal service requirements. This procedure includes the following:
All assembled circuit boards are given a thorough visual inspection and are then tested in a bench-
reference Enterprise.
The tested, assembled circuit boards are then installed in a new Enterprise and the whole unit is
tested for every function and parameter.
The unit is put on a burn-in torture rack to test for any possible component failures.
The Enterprise then undergoes a critical listening and functional test.
The unit has all remaining chassis components installed and then undergoes a complete visual
inspection, which assures that all Enterprises meet visual specifications.
The front panel of the Enterprise is manufactured in two versions – a left and a right, as shown in figure 3. A
left version has the tower on the right side of the faceplate and is intended to be placed on the left side of the
room. Visa versa for the right.
Burn-In/Break-In Time
This unit has a break in period of about 1 week during which continuous improvement in sound quality will be
observed. It is recommended that music be played continuously through the unit during this time to expedite
the break in period.
Reference Manual Conventions
For clarity purposes, references to buttons and LED's will be shown in bold capital letters.
1
Need help?
Do you have a question about the Enterprise and is the answer not in the manual?
Questions and answers