American Dryer Corp. Phase 7 / OPL ensor Activated Fire Extinguishing System D120 Installation Manual
American Dryer Corp. Phase 7 / OPL ensor Activated Fire Extinguishing System D120 Installation Manual

American Dryer Corp. Phase 7 / OPL ensor Activated Fire Extinguishing System D120 Installation Manual

Phase 7 / opl sensor activated fire extinguishing system

Advertisement

D120 Installation Manual
Sensor Activated Fire Extinguishing System
WARNING: For your safety the information in
this manual must be followed to minimize the
risk of fire or explosion or to prevent property
damage, personal injury or death.
— Do not store or use gasoline or other flammable
vapors and liquids in the vicinity of this or any
other appliance.
— WHAT TO DO IF YOU SMELL GAS:
• Do not try to light any appliance.
• Do not touch any electrical switch; do not
use any phone in your building.
• Clear the room, building or area of all
occupants.
• Immediately call your gas supplier from a
neighbor's phone. Follow the gas supplier's
instructions.
• If you cannot reach your gas supplier, call
the fire department.
— Installation and service must be performed by a
qualified installer, service agency or the gas
supplier.
Phase 7 / OPL
AVERTISSEMENT: Assurez-vous de bien
suivre les instructions données dans cette notice
pour réduire au minimum le risque d'incendie
ou d'explosion ou pour éviter tout dommage
matériel, toute blessure ou la mort.
— Ne pas entreposer ni utiliser d'essence ni
— QUE FAIRE SI VOUS SENTEZ UNE ODEUR
— L'installation et l'entretien doivent être assurés par
Telephone: +1 (508) 678-9000 / Fax: +1 (508) 678-9447
d'autres vapeurs ou liquides inflammables à
proximité de cet appareil ou de tout autre
appareil.
DE GAZ:
• Ne pas tenter d'allumer d'appareils.
• Ne touchez à aucun interrupteur. Ne pas
vous servir des téléphones se trouvant dans
le bâtiment.
• Évacuez la pièce, le bâtiment ou la zone.
• Appelez immédiatement votre fournisseur
de gaz depuis un voisin. Suivez les
instructions du fournisseur.
• Si vous ne pouvez rejoindre le fournisseur
de gaz, appelez le service des incendies.
un installateur ou un service d'entretien qualifié
ou par le fournisseur de gaz.
American Dryer Corporation
88 Currant Road
Fall River MA 02720-4781 USA
e-mail: techsupport@amdry.com
www.amdry.com
ADC Part No. 113179 - 3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Phase 7 / OPL ensor Activated Fire Extinguishing System D120 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for American Dryer Corp. Phase 7 / OPL ensor Activated Fire Extinguishing System D120

  • Page 1 D120 Installation Manual Sensor Activated Fire Extinguishing System WARNING: For your safety the information in this manual must be followed to minimize the risk of fire or explosion or to prevent property damage, personal injury or death. — Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance.
  • Page 2 Retain This Manual In A Safe Place For Future Reference American Dryer Corporation products embody advanced concepts in engineering, design, and safety. If this product is properly maintained, it will provide many years of safe, efficient, and trouble free operation. ONLY qualified technicians should service this equipment.
  • Page 3: For Your Safety

    YOU MUST DISCONNECT AND LOCKOUT THE ELECTRIC SUPPLY AND THE GAS SUPPLY OR THE STEAM SUPPLY BEFORE ANY COVERS OR GUARDS ARE REMOVED FROM THE MACHINE TO ALLOW ACCESS FOR CLEANING, ADJUSTING, INSTALLATION, OR TESTING OF ANY EQUIPMENT PER OSHA (Occupational Safety and Health Administration) STANDARDS.
  • Page 4 WARNING The dryer must never be operated with any of the back guards, outer tops, or service panels removed. PERSONAL INJURY OR FIRE COULD RESULT. WARNING DRYER MUST NEVER BE OPERATED WITHOUT THE LINT FILTER/SCREEN IN PLACE, EVEN IF AN EXTERNAL LINT COLLECTION SYSTEM IS USED. IMPORTANT PLEASE OBSERVE ALL SAFETY PRECAUTIONS displayed on the equipment and/or specified in the installation manual included with the dryer.
  • Page 5: Table Of Contents

    SECTION I IMPORTANT INFORMATION ... 3 A. Receiving and Handling ... 3 B. Safety Precautions ... 4 SECTION II SPECIFICATIONS/COMPONENT IDENTIFICATION ... 6 A. Specifications ... 6 B. Component Identification ... 8 SECTION III INSTALLATION PROCEDURES ... 10 A. Location Requirements ... 10 B.
  • Page 6 SECTION VI ROUTINE MAINTENANCE ... 39 A. Cleaning ... 39 B. Adjustments ... 41 C. Lubrication ... 41 SECTION VII MANUAL RESET BURNER HI-LIMIT INSTRUCTIONS ... 42 A. Phase 7 ... 42 B. Dual Timer ... 42 SECTION VIII DATA LABEL INFORMATION ... 43 A.
  • Page 7: Important Information

    IMPORTANT INFORMATION A. RECEIVING AND HANDLING The dryer is shipped in a protective stretch wrap cover with protective cardboard corners and top cover (or optional box) as a means of preventing damage in transit. Upon delivery, the dryer and/or packaging, and wooden skid should be visually inspected for shipping damage.
  • Page 8: Safety Precautions

    B. SAFETY PRECAUTIONS WARNING: For your safety, the information in this manual must be followed to minimize the risk of fire or explosion or to prevent property damage, personal injury, or loss of life. WARNING: The dryer must never be operated with any of the back guards, outer tops, or service panels removed.
  • Page 9 7. A program should be established for the inspection and cleaning of lint in the burner area, exhaust ductwork, and area around the back of the dryer. The frequency of inspection and cleaning can best be determined from experience at each location. WARNING: The collection of lint in the burner area and exhaust ductwork can create a potential fire hazard.
  • Page 10: Specifications/Component Identification

    SPECIFICATIONS/COMPONENT IDENTIFICATION A. SPECIFICATIONS MAXIMUM CAPACITY (DRY WEIGHT) TUMBLER DIAMETER TUMBLER DEPTH TUMBLER VOLUME TUMBLER/DRIVE MOTOR BLOWER/FAN MOTOR DOOR OPENING (DIAMETER) DOOR SILL HEIGHT WATER CONNECTION DRYERS PER 20’/40’ CONTAINER DRYERS PER 48’/53’ TRUCK VOLTAGE AVAILABLE APPROXIMATE NET WEIGHT APPROXIMATE SHIPPING WEIGHT AIRFLOW HEAT INPUT EXHAUST CONNECTION (DIAMETER)
  • Page 11: Specifications

    Specifications D120 NOTE: ADC reserves the right to make changes in specifications at any time without notice or obligation.
  • Page 12: Component Identification

    B. COMPONENT IDENTIFICATION 1. Dryer Front View Illus. No. Description Microprocessor Control/Keyboard (touch pad) Panel Assembly (controls) Control (top access) Door Assembly Main Door Assembly Lint Panel Assembly Lint Door Wire Diagram (located behind control door) Top Console (module) Assembly...
  • Page 13 2. Dryer Rear View Illus. No. Description Electrical Service Connections Top Console Heating Unit Relay/Wiring Box Data Label and Installation Label Air Connection Exhaust Transition Piece...
  • Page 14: Installation Procedures

    INSTALLATION PROCEDURES Installation should be performed by competent technicians in accordance with local and state codes. In the absence of these codes, the installation must conform to applicable American National Standards: ANSI Z223.1- LATEST EDITION (National Fuel Gas Code) or ANSI/NFPA NO. 70-LATEST EDITION (National Electrical Code) or in Canada, the installation must conform to applicable Canadian Standards: CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 (Liquid Propane [L.P.] Gas) or LATEST EDITION (for General Installation and Gas Plumbing) or Canadian Electrical Codes Parts 1 &...
  • Page 15: Unpacking/Setting Up

    10. The dryer must be installed with provisions for adequate combustion and make-up air supply. CAUTION: This dryer produces combustible lint and must be exhausted to the outdoors. Every 6 months, inspect the exhaust ducting and remove any lint build up. IMPORTANT: Dryer must be installed in a location/environment, which the ambient temperature remains between 40º...
  • Page 16 2. If more headroom is needed when moving the dryer into position, the top console (module) may be removed. a. To Remove Top Console (module)... 1) Disconnect the ground wire (A in the illustration below) located at the rear upper left corner of the dryer.
  • Page 17: Dryer Enclosure Requirements

    C. DRYER ENCLOSURE REQUIREMENTS Even though a 12-inch (30.48 cm) clearance is acceptable, it is recommended that the rear of the dryer be positioned approximately 24-inches (60.96 cm) from the nearest obstruction (i.e., wall) for ease of installation, maintenance, and service. Bulkheads and partitions should be made from noncombustible materials. The clearance between the bulkhead header and the dryer must be a minimum of 4-inches (10.16 cm) and must not extend more than 4-inches (10.16 cm) to the rear of the front.
  • Page 18: Fresh Air Supply Requirements

    D. FRESH AIR SUPPLY REQUIREMENTS When the dryer is operating, it draws in room air, heats it, passes this air through the basket (tumbler), and exhausts it out of the building. Therefore, the room air must be continually replenished from the outdoors. If the make-up air is inadequate, drying time and drying efficiency will be adversely affected.
  • Page 19: Exhaust Requirements

    E. EXHAUST REQUIREMENTS 1. General Exhaust Ductwork Information Exhaust ductwork should be designed and installed by a qualified professional. Improperly sized ductwork will create excessive back pressure which results in slow drying, increased use of energy, overheating of the dryer, and shutdown of the burner by the airflow (sail) switches, burner hi-limits, or basket (tumbler) hi-heat thermostats.
  • Page 20 a. Outside Ductwork Protection 1) To protect the outside end of the horizontal ductwork from the weather, a 90° elbow bent downward should be installed where the exhaust exits the building. If the ductwork travels vertically up through the roof, it should be protected from the weather by using a 180° turn to point the opening downward.
  • Page 21 It is suggested that the ductwork from each dryer not exceed 20 feet (6.09 meters) with no more than two (2) elbows (excluding dryer connections). If the ductwork exceeds 20 feet (6.09 meters) or has numerous elbows, the cross-sectional area of the ductwork must be increased in proportion to the length and number of elbows in it.
  • Page 22 IMPORTANT: For extended ductwork runs, the cross section area of the ductwork can only be increased to an extent. Maximum proportional ductwork runs cannot exceed 20 feet (6.09 meters) more than the original limitations of 20 feet (6.09 meters) with two (2) elbows.
  • Page 24: Electrical Information

    IMPORTANT: For extended ductwork runs, the cross section area of the ductwork can only be increased to an extent. Maximum proportional ductwork runs cannot exceed 20 feet (6.09 meters) more than the original limitations of 20 feet (6.09 meters) with two (2) elbows.
  • Page 25 2. Electrical Service Specifications ELECTRICAL SERVICE SPECIFICATIONS (PER DRYER) IMPORTANT: NOTES: SERVICE VOLTAGE 400 / 416 460 / 480 * Three wire is available. ELECTRICAL SERVICE SPECIFICATIONS (PER DRYER) IMPORTANT: NOTES: SERVICE VOLTAGE * Three wire is available. IMPORTANT: The dryer must be connected to the electric supply shown on the data label that is affixed to the left side panel/wall area behind the control door.
  • Page 26 3. Electrical Connections NOTE: A wire diagram is included with each dryer and is affixed to the back side of the top control (access) door. The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, and L3), GROUND, and in the case of 4 wire service, the NEUTRAL.
  • Page 27: Gas Information

    G. GAS INFORMATION It is your responsibility to have ALL plumbing connections made by a qualified professional to assure that the gas plumbing installation is adequate and conforms to local and state regulations or codes. In the absence of such codes, ALL plumbing connections, materials, and workmanship must conform to the applicable requirements of the National Fuel Gas Code ANSI Z223.1-LATEST EDITION, or in Canada, the Canadian Installation Codes CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 (Liquid Propane [L.P.] Gas) or LATEST...
  • Page 28: Type Of Gas

    2. Technical Data a. Gas Specifications Manifold Pressure* 3.5 inches W.C. In-Line Pressure 6.0 - 12.0 inches W.C. Shaded areas are stated in metric equivalents * Measured at the gas valve pressure tap when the gas valve is on. b. Gas Connections: Inlet connection ---- 1-1/4”...
  • Page 29 3. Piping/Connections ALL components/materials must conform to National Fuel Gas Code Specifications ANSI Z223.1-LATEST EDITION, or in Canada, CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 (Liquid Propane [L.P.] Gas) or LATEST EDITION (for General Installation and Gas Plumbing), as well as local codes and ordinances and must be done by a qualified professional.
  • Page 30 IMPORTANT: The dryer and its individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig (3.5 kPa). NOTE: The dryer must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure test of the gas supply system at test pressures equal to or less than 1/2 psig (3.5 kPa).
  • Page 31: Steam Information

    H. STEAM INFORMATION It is your responsibility to have ALL plumbing connections made by a qualified professional to assure that the gas plumbing installation is adequate and conforms to local and state regulations or codes. IMPORTANT: Failure to comply with the requirements stipulated in this manual can result in component failure, which will VOID THE WARRANTY.
  • Page 32 a. The pressure of the condensate in the steam supply line will cause water hammer and subsequent heat exchanger (steam coil) failure. The steam supply connection into the main supply line must be made with a minimum 12-inch (30.48 cm) riser. This will prevent any condensate from draining towards the dryer.
  • Page 33: Com Pressed Air Supply

    4. Steam Damper Air System Connections The dryer is manufactured with a pneumatic (piston) damper system, which requires an external supply of compressed air. The air connection is made to the steam damper solenoid valve, which is located at the rear of the top console.
  • Page 34 6. Steam Damper Air Piston (Flow Control) Operation Adjustment Although the steam damper operation was tested and adjusted prior to shipping at 80 PSI (5.51 bar), steam damper operation must be checked before the dryer is put into operation. Refer to page 33 for instructions to check steam damper operation.
  • Page 35: Preparation For Operation/Start-Up

    I. PREPARATION FOR OPERATION/START-UP The following items should be checked before attempting to operate the dryer: 1. Read ALL “CAUTION,” “WARNING,” and “DIRECTION” labels attached to the dryer. 2. Check incoming supply voltage to be sure that it is the same as indicated on the dryer data label that is affixed to the left side panel/wall area behind the control door (refer to the illustration on page 9).
  • Page 36: Preoperational Tests

    J. PREOPERATIONAL TESTS ALL dryers are thoroughly tested and inspected before leaving the factory. However, a preoperational test should be performed before the dryer is publicly used. It is possible that adjustments have changed in transit or due to marginal location (installation) conditions. 1.
  • Page 37 b. Steam Models 1) Check to insure that the steam damper is functioning properly. a) The steam damper should not “slam” (open or closed) when it reaches the end of (piston) travel. Additionally, the steam damper should not bind and/or stop during travel. If either of these conditions occur, the flow control must be adjusted.
  • Page 38: Compressed Air Requirements

    K. COMPRESSED AIR REQUIREMENTS The dryer requires an external supply of compressed air (2.5 cfh at 80 PSI [0.07 cmh at 5.51 bar] for gas models and 3.25 cfh at 80 PSI [0.09 cmh at 5.51 bar] for steam models). For steam models, compressed air is necessary for the air operated steam damper.
  • Page 39: Shutdown Instructions

    L. SHUTDOWN INSTRUCTIONS If the dryer is to be shutdown (taken out of service) for a period of time, the following must be performed: 1. Discontinue power to the dryer either at the external disconnect switch or the circuit breaker. 2.
  • Page 40: Service/Parts Information

    SERVICE/PARTS INFORMATION A. SERVICE 1. Service must be performed by a qualified trained technician, service agency, or gas supplier. If service is required, contact the reseller from whom the ADC equipment was purchased. If the reseller cannot be contacted or is unknown, contact the ADC Service Department for a reseller in your area. NOTE: When contacting the ADC Service Department, be sure to give them the correct model number and serial number so that your inquiry is handled in an expeditious manner.
  • Page 41: Warranty Information

    WARRANTY INFORMATION A. RETURNING WARRANTY CARDS 1. Before any dryer leaves the ADC factory test area, a warranty card is placed on the back side of the main door glass. These warranty cards are intended to serve the customer where we record the individual installation date and warranty information to better serve you should you file a warranty claim.
  • Page 42 2. Each part must be tagged with the following information: a. Model number and serial number of the dryer from which part was removed. b. Nature of failure (be specific). c. Date of dryer installation. d. Date of part failure. e.
  • Page 43: Routine Maintenance

    ROUTINE MAINTENANCE A. CLEANING A program and/or schedule should be established for periodic inspection, cleaning, and removal of lint from various areas of the dryer, as well as throughout the ductwork system. The frequency of cleaning can best be determined from experience at each location. Maximum operating efficiency is dependent upon proper air circulation.
  • Page 44 STEAM DRYERS Clean the steam coil fins. Compressed air and a vacuum cleaner with brush attachment are suggested. NOTE: When cleaning steam coil fins, be careful not to bend the fins. If fins are bent, straighten by using a fin comb, which is available from any local air conditioning supply house. 90 DAYS Remove lint from around basket (tumbler), drive motors, and surrounding areas.
  • Page 45: Adjustments

    B. ADJUSTMENTS 7 DAYS AFTER INSTALLATION AND EVERY 6 MONTHS THEREAFTER Inspect bolts, nuts, screws, (bearing setscrews), grounding connections, and nonpermanent gas connections (i.e., unions, shutoff valves, and orifices). Motor and drive belts should be examined. Cracked or seriously frayed belts should be replaced. Tighten loose V-belts when necessary. Complete operational check of controls and valves.
  • Page 46: Manual Reset Burner Hi-Limit Instructions

    SECTION VII MANUAL RESET BURNER HI-LIMIT INSTRUCTIONS A. PHASE 7 This dryer was manufactured with a manual reset burner hi-limit thermostat, which is monitored by the Phase 7 computer. If the burner hi-limit is open prior to the start of the drying cycle, the dryer will start momentarily and then shut down, the Phase 7 computer will display “BURNER HIGH LIMIT FAULT”...
  • Page 47: Section Viii

    DATA LABEL INFORMATION A. DATA LABEL When contacting American Dryer Corporation, certain information is required to insure proper service/parts information from ADC. This information is on the data label that is affixed to the left side panel/wall area behind the control door. When contacting ADC, please have the model number and serial number available. 1.
  • Page 48: Procedure For Functional Check Of Replacement Components

    PROCEDURE FOR FUNCTIONAL CHECK OF REPLACEMENT COMPONENTS 1. For Heat Control Module Ignition Circuit a. For Models with Direct Spark Ignition (DSI) Module (Type I) Theory of Operation: Start the drying cycle. When the gas burner ignites within the chosen trial for ignition time (6-seconds), the flame sensor detects gas burner flame and signals the DSI module to keep the gas valve open as long as there is a call for heat.
  • Page 49: Phase 7 Opl System Diagnostics

    PHASE 7 OPL SYSTEM DIAGNOSTICS IMPORTANT: YOU MUST DISCONNECT AND LOCKOUT THE ELECTRIC SUPPLY AND THE GAS SUPPLY OR THE STEAM SUPPLY BEFORE ANY COVERS OR GUARDS ARE REMOVED FROM THE MACHINE TO ALLOW ACCESS FOR CLEANING, ADJUSTING, INSTALLATION, OR TESTING OF ANY EQUIPMENT PER OSHA (Occupational Safety and Health Administration) STANDARDS.
  • Page 50 OUTPUTS: (GREEN) FAN - Blower Fan On FWD - Basket (Tumbler) Forward REV - Basket (Tumbler) Reverse AIR JET - Air Jet On HEAT - Front Heat STEAM - Steam Injection AUX - Fire Suppression System (F.S.S.) Active On Input/Output (I/O) Board Output Description (“Green” light emitting diode [L.E.D.]) 1.
  • Page 51: Optional Sensor Activated Fire Extinguishing (S.a.f.e.) System

    SECTION XI OPTIONAL SENSOR ACTIVATED FIRE EXTINGUISHING (S.A.F.E.) SYSTEM S.A.F.E. System In Action The exclusive Sensor Activated Fire Extinguishing (S.A.F.E.) System will extinguish fires that may start in the drying basket (tumbler). A series of sensors positioned throughout the basket (tumbler) and interfaced with the microprocessor will trigger the S.A.F.E. system water jet(s) to quickly extinguish the flames.
  • Page 52: Installation

    BEFORE YOU START! CHECK LOCAL CODES AND PERMITS Call your local water company or the proper municipal authority for information regarding local codes. IMPORTANT: It is your responsibility to have ALL plumbing connections made by a qualified professional to assure that the plumbing installation is adequate and conforms to local, state, and federal regulations or codes.
  • Page 53 2. Water Connections: The water connection is made to the 1/2” M.P.T. bushing of the electric water solenoid valve located at the rear upper left area of the dryer (see photo). The water solenoid valve has a 3/8” M.P.T. connection and a 1/2” bushing is supplied to provide the minimum 1/2-inch supply (feed) line.
  • Page 54 OPTIONAL MANUAL BYPASS Provisions are made in the dryer sensor activated fire extinguishing (S.A.F.E.) system for the installation of an optional manual bypass. Depending on the model dryer, the connections for the manual bypass are made at the “T” or “four way” fitting located in the outlet supply side of the water solenoid valve. The use and connections of this manual bypass are at the option or discretion of the owner.
  • Page 55: Sensor Activated Fire Extinguishing (S.a.f.e.) System Theory Of Operation

    Sensor Activated Fire Extinguishing (S.A.F.E.) System Theory of Operation While the dryer is in an idle state or 20-seconds after the heat turns off, the Phase 7 control monitors the S.A.F.E. system probe located in the top of the basket (tumbler) chamber and records the minimum temperature. If the minimum recorded S.A.F.E.
  • Page 56 ADC Part No. 113179 3 - 09/11/08 - 5...

Table of Contents

Save PDF