Installation Check List - ACR Electronics 2800 Product Support Manual

Ship security alert system
Table of Contents

Advertisement

Please Review to ensure you have properly installed this SSAS beacon:
 Installed the beacon and bracket on a flat vertical surface in a discreet location. (Paragraph 3.2)
 Installed the activation switches. (Minimum of two.)
 One must be on the navigation bridge.
 Switches shall not be labeled. (Paragraph 3.3.4)
 Connected switch wire to switches and terminal block on the top of the mounting bracket. Route
wire appropriately. (Paragraph 3.3.5)
 Assembled the antenna using the rods, set screws and wrench provided. (Paragraph 3.4.3)
 Installed the antenna in a location at least at least 10 ft (3 m) above deck and with clear view of
the sky using either the included 4" mount or other mount with compatible 1" x 14 threads.
(Paragraph 3.4.4)
 Connected antenna to beacon using SMA and TNC connectors provided and RG-8/U coaxial
connector. Route cable appropriately. (Paragraph 3.4.5)
 Upon completion of the installation, perform the activation switch (Paragraph 3.3.6) and cross
dipole antenna (Paragraph 3.4.6) installation verification tests.
 Upon successful completion of installation verification tests, place the beacon in READY mode.
ADDITIONAL NOTES:

INSTALLATION CHECK LIST