Disposing Of The Packaging; Transporting The Appliance - Vaillant ecoTEC VU Installation And Maintenance Instructions Manual

Vaillant ecotec boiler installation and maintenance instructions
Table of Contents

Advertisement

Item
Qty
Description
1
1
Wall bracket
2
1
Boiler
3
1
Flow restrictor
Supply pipes (gas, heating, expansion relief
4
4
valve)
5
3
Service valves
6
1
Montageschablone
7
1
Enclosure documentation
8
2
Bags with parts
4.2 Scope of delivery for ecoTEC VU boiler
8
7
6
5
4.2 Scope of delivery for ecoTEC VUW boiler
Item
Qty
Description
1
1
Wall bracket
2
1
Boiler
3
1
Flow restrictor
Supply pipes (gas, heating, water, expansion
4
6
relief valve)
5
4
Service valves
6
1
Installation template
7
1
Enclosure documentation
8
2
Bags with parts
4.3 Scope of delivery for ecoTEC VUW boiler
Installation and maintenance instructions ecoTEC 0020173113_01

4.2.3 Disposing of the packaging

> Dispose of the cardboard packaging used on the ecoTEC
at a cardboard recycling site.
> Dispose of the plastic film and plastic filling at an appro-
priate plastic recycling site.
> Observe national regulations.
4.3

Transporting the appliance

Important:
1
With regards to the Manual Handling Operations, 1992 Reg-
ulations, the following lift operation exceeds the recom-
mended weight for a one man lift.
General recommendations when handling
2
> Clear the route before attempting the lift.
> Ensure safe lifting techniques are used – keep back
straight – bend using legs.
> Keep load as close to body as possible. Do not
twist – reposition feet instead.
> If 2 persons performing lift, ensure co-ordinated move-
ments during lift.
> Avoid upper body/top heavy bending - do not lean
forward/sideways.
3
> Recommend wear suitable cut resistant gloves with good
grip to protect against sharp edges and ensure good
grip.
4
> Always use assistance if required.
Removal of carton from delivery van
Recommend 2 person lift or 1 person with use of sack truck.
> If 1 person is performing lift, straddle the load, tilt and
place carton into position on truck.
> Recommend secure appliance onto truck with suitable
straps.
> Ensure safe lifting techniques are used – keep back
straight – bend using legs.
> Keep load as close to body as possible.
> If 2 persons performing lift, ensure co-ordinated move-
ments during lift.
> Always use assistance if required.
Carriage of carton from point of delivery to point
of installation – ground floor.
Recommend 2 person lift or 1 person with use of sack truck.
> If 1 person is performing lift, straddle the load, tilt and
place carton into position on truck.
> Recommend secure appliance onto truck with suitable
straps.
> Ensure safe lifting techniques are used – keep back
straight – bend using legs.
> Keep load as close to body as possible.
> If 2 persons performing lift, ensure co-ordinated move-
ments during lift.
> Clear the route before attempting the lift.
Installation
4
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecotec vuw

Table of Contents