Furnace Location Relative To Cooling Equipment; Location; Hazardous Locations; Installation - Carrier 58MCA Installation, Start-Up, And Operating Instructions Manual

4-way multipoise fixed-capacity direct-vent condensing gas furnace, series 140 (limited)
Table of Contents

Advertisement

32 F MINIMUM INSTALLED
AMBIENT OR FREEZE
PROTECTION REQUIRED
If these furnaces are installed in an unconditioned space
where ambient temperatures may be 32°F or lower, freeze
protection measures must be taken.
Provide ample space for servicing and cleaning. Always comply
with minimum fire protection clearances shown on unit's clear-
ance to combustibles label. (See Fig. 3.) Locate furnace where
available electric power and gas supplies meet specifications on
furnace rating plate.
Step 2—Furnace Location Relative to Cooling
Equipment
The cooling coil must be installed parallel with or on downstream
side of furnace to avoid condensation in heat exchanger. When
installed parallel with a furnace, dampers or other means used to
control flow of air must prevent chilled air from entering furnace.
If dampers are manually operated, they must be equipped with a
means to prevent operation of either unit unless damper is in
full-heat or full-cool position.
Step 3—Hazardous Locations
When furnace is installed in a residential garage, it must be
installed so that burners and ignition sources are located a
minimum of 18 in. above floor. The furnace must be located
or protected to avoid physical damage by vehicles. When
furnace is installed in a public garage, airplane hangar, or
other building having a hazardous atmosphere, unit must be
installed in accordance with requirements of National Fire
Protection Association, Inc.
A93058
18-IN. MINIMUM
TO BURNERS
A93044

INSTALLATION

Step 1—Leveling Legs (If Desired)
When furnace is used in upflow position with side inlet(s), leveling
legs may be desired. (See Fig. 12.) Install field-supplied,
corrosion-resistant 5/16-in. machine bolts and nuts.
5
16
3
1
4
5
16
1
Fig. 12—Leveling Legs
NOTE: The maximum length of bolt should not exceed 1-1/2 in.
1. Position furnace on its back. Locate and drill a 5/16-in.
diameter hole in each bottom corner of furnace. (See Fig. 12.)
Holes in bottom closure panel may be used as guide locations.
2. For each hole, install nut on bolt and then install bolt and nut
in hole. (Install flat washer if desired.)
3. Install another nut on other side of furnace base. (Install flat
washer if desired.)
4. Adjust outside nut to provide desired height, and tighten inside
nut to secure arrangement.
NOTE: Bottom closure must be used when leveling legs are used.
See Bottom Closure Panel section.
Step 2—Installation in Upflow or Downflow
Applications
NOTE: For downflow applications, this furnace is approved for
use on combustible flooring when special base (available from
manufacturer) Part No. KGASB0201ALL is used. Special base in
not required when this furnace is installed on manufacturer's Coil
Assembly Part No. CD5 or CK5, or Coil Box Part No. KCAKC is
used.
1. Determine application being installed from Table 1.
2. Construct hole in floor per dimensions specified in Table 1
and Fig. 13.
3. Construct plenum to dimensions specified in Table 1 and Fig.
13.
4. If downflow subbase (KGASB) is used, install as shown in
Fig. 14.
If Coil Assembly Part No. CD5 or CK5 or Coil Box Part No.
KCAKC is used, install as shown in Fig. 15.
NOTE: Remove furnace perforated, discharge duct flanges when
they interfere with mating flanges on coil on downflow subbase.
To remove furnace perforated, discharge duct flange, use wide
13
5
16
3
1
4
5
16
3
4
3
1
4
A89014

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents