Installation - Hoshizaki Reach-In Instruction Manual

Professional series heated holding cabinet
Hide thumbs Also See for Reach-In:
Table of Contents

Advertisement

Heated Holding Cabinet

INSTALLATION

CONGRATULATIONS...
...and thank you for purchasing a Hoshizaki Heated Holding Cabinet.
Your unit has been designed and manufactured under rigid controls
to assure you the most efficient service. It is a full time unit,
and may be used continuously.
Please take a moment to read through this booklet of important
information pertaining to your cabinet. By following a routine of
proper use and care described on the following pages, your cabinet
will last for many years.
IMPORTANT: Your Manufacturer Registration Card must be
returned within 30 days after initial delivery to activate the warranty.
SERIAL AND MODEL NUMBER
Facing the rear of the unit, the serial tag is located at the top
right. For Pass-Thru Models, facing the control side, the serial
tag is located top rear of the left side. Please record the serial
and model number in this booklet in the space provided on
page 10. When ordering parts and/or service, you will need to
provide this information. The voltage and amperage of the unit
are also stamped on the serial tag.
UNPACKING
Keep unit properly balanced. Weight of the components
are at the top. Do not allow unit to tip over. After uncrating
your cabinet, remove all tape and padding which held all
doors, shelves, racks, cord, etc., in place during shipment.
3
PROFESSIONAL SERIES

Advertisement

Table of Contents
loading

Table of Contents