8
uNpACKING
The following equipment is included in the rack-mount kit box.
02
One (1) Side Rail, Eight (8) Screws
used to mount the NVIDIA Quadro plex 7000 in
a standard 19" eIA rack.
x8
One (1) Rear Alignment Bracket,
Four (4) Screws
used when mounting two (2) NVIDIA Quadro plex
x4
7000 in a rack side-by-side to provide alignment
and finish.
Two (2) Thumb Screws
used to secure the NVIDIA Quadro plex 7000 to
the rack and side rail.
Need help?
Do you have a question about the Quadro PLEX 7000 and is the answer not in the manual?