Heat & Glo ST-550T-IPI Owner's Manual page 60

Installation and operation
Hide thumbs Also See for ST-550T-IPI:
Table of Contents

Advertisement

B. Vent Components Diagrams (continued)
(206 mm)
15 in.
(381 mm)
Figure 16.5 SLP Series Vent Components
60
Fire Risk.
• When using SLP-HRC-SS and SLP-HRC-ZC-
SS termination caps on top vented fi replaces,
a one foot minimum vertical vent section is
required before installing fi rst elbow.
• When using DVP-TB1 termination cap on top vented
fi replaces, a three foot minimum vertical vent section is required
before installing fi rst elbow.
8-1/8 in.
13 in.
(330 mm)
HORIZONTAL TERMINATION CAP
SL-2DVP
SLP90
ASSEMBLY
HORIZONTAL TERMINATION CAP
2-3/4 in.
(70 mm)
(406 mm)
(For use with IPI and DSI appliances only.)
Heat & Glo • ST-550T-IPI • 2126-900 Rev. H • 3/13
WARNING
Effective Length
5-3/4 to 8-3/8 in.
146 to 213 mm
SLP-HRC-SS
SLP-HRC-ZC-SS
DVP-TB1
DVP-TB1
9 in.
(229 mm)
11-1/2 in.
(292 mm)
12-1/4 in.
(311 mm)
16 in.
PVK-80
5-1/2 in.
8-3/8 in.
140 mm
213 mm
87°
10-1/2 in.
267 mm
10-7/8 in.
276 mm
DVP-TB1
12-1/2 in.
(317 mm)

Advertisement

Table of Contents
loading

Table of Contents