Download Print this page

User Notices; Electrical Requirements; Operating Controls - Bunn FPG Operating & Service Manual

Advertisement

Carefully read and follow all notices on the grinder and in this manual. They were written for your protection.
All notices on the grinder are to be kept in good condition. Replace any unreadable or damaged labels
#05876.0000

ELECTRICAL REQUIREMENTS

The grinder has an attached cordset and requires 2-wire, grounded service rated 120 volts ac, 15 amp, single
phase, 60 Hz for 120V models; 100 volts ac, 15 amp single phase, 50Hz for 100V models; and 230 volts ac, 10
amp single phase, 50 Hz for 230V models.

OPERATING CONTROLS

Off/On/Start Switch
OFF - (upper position) Switching to this position stops all operation of the
grinder.
ON - (middle position) The switch will return to this position after a grind
cycle has begun and will remain in this position after grinding has ceased.
START - (lower, momentary position) Pressing the switch to this position
and releasing initiates a grind cycle.
Batch Selector Switch
Select Small, Medium or Large batch by turning the round selector knob
on the left front of the grinder.

USER NOTICES

3
#20545.0000
.
P2947
P2947
36783 051104

Advertisement

loading