Operation Checklist - GE JP655 Installation Instructions Manual

36"
Hide thumbs Also See for JP655:
Table of Contents

Advertisement

Installation Instructions
CHECKLISTS
-IPRE-TEST
CHECKLIST
[]
Remove
all protective
film,
if present,
and any stickers.
[]
Check to be sure that all wiring
is secure
and not pinched
or in contact
with
moving
parts.
[]
Check
level
of appliance.
[]
Check that the cooktop
is properly
grounded.
OPERATION
CHECKLIST
Remove
all items
from
the top
of the cooktop
surface.
[]
Turn on the power
to the cooktop.
(Refer to your
Owner's
Manual.)
Verify
that all surface
burners
operate
properly,
[]
Check that the circuit
breaker
is not
tripped
nor the house
fuse blown.
[]
Check that conduit
is securely
connected
to the junction
box.
[]
See Owner's
Manual
for
troubleshooting
list.
NOTE
TO ELECTRICIAN:
The power
leads supplied
with
this appliance
are UL recognized
for connections
to larger
gauge
household
wiring.
The insulation
of
these
leads is rated at temperatures
much
higher
than the temperature
rating
of
household
wiring.
The current
carrying
capacity
of a conductor
is governed
by the
wire
gauge and also the temperature
rating
of the insulation
around
the wire.
NOTE:
ALUMINUM
WIRING
• WARNING:
IMPROPER
CONNECTION
OF ALUMINUM
HOUSE
WIRING
TO THE COPPER
LEADS
CAN RESULT IN A SERIOUS
PROBLEM.
• Splice copper wires to aluminum
wiring
using special connectors
designed
and
UL approved
for joining
copper to
aluminum
and follow
the manufacturer's
recommended
connector
procedure
closely.
NOTE: Wire used, location
and enclosure
of
splices, etc., must conform
to good wiring
practice
and local codes.
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pp962Pp972Pp975Pp980Zeu36kJp960 ... Show all

Table of Contents