Assembly; Scope Of Delivery; Accessories; Installation Site - Vaillant ecoTEC VU 656/4 Installation And Maintenance Instructions Manual

Gas fired wall hung high efficiency boiler
Hide thumbs Also See for ecoTEC VU 656/4:
Table of Contents

Advertisement

4 Assembly

4
Assembly
a
Caution!
Flush the heating installation thoroughly before
installing the boiler to remove foreign sub-
stances such as solder and flux residue, lefto-
ver sealant or dirt.
4.1

Scope of delivery

The Vaillant ecoTEC is delivered pre-mounted in a
package unit.
Check that all parts have been delivered and are intact
(see Fig. 4.1 and Table 4.1).
Installation instructions
ecoTEC
10
Installation instructions
ecoTEC
Installation instructions
ecoTEC
9
8
7
6
2 x
Fig. 4.1 Scope of delivery
4.2

Accessories

Optional accessories for use in conjunction with the
installation and operation of the boiler are available.
4.3

Installation site

Please note the safety instructions below before
choosing where to install the boiler:
a
Caution!
Do not install the boiler in rooms prone to frost.
In rooms with aggressive steam or dust, the
boiler must be operated independently of the
ventilation!
10
When choosing the installation site and while operating
the boiler, make sure that the combustion air is
technically free of chemical substances containing
fluorine, chlorine, sulphur etc. Sprays, solvents and
cleaning agents, paints, adhesives etc. contain these
kinds of substances, which in the worst case can lead to
corrosion, also in the flue system, during ambient air
dependent operating of the boiler.
The boiler must be operated independently of the
ambient air, particularly in hairdressing salons,
carpenter's shops, or paint shops and cleaning
companies. Otherwise, a separate installation room is
required to guarantee that the combustion air supply is
technically free of the substances mentioned above.
Position Number Name
1
1
1
2
1
2
3
1
4
1
5
1
6
2
7
1
8
1
3
9
1
10
1
4
5
Table 4.1 Scope of delivery
Select position of boiler
Refer to section 'Installation site' for information
regarding the siting of the boiler. In general the boiler
must be positioned such that:
• There is sufficient space around the boiler for service
and maintenance.
• The boiler can be correctly flued, i.e. the flue terminal
position is sited in accordance with these instructions
and the air/flue duct can be installed in accordance
with the flue installation instructions supplied.
• All necessary pipework can be connected, including
the pressure relief valve and condensate drain.
Installation and maintenance instructions ecoTEC 0020029173_01
Hanging bracket
Boiler
Installation kit for siphon cartridge
Expansion relief valve
Gas isolation valve
Stop cocks
Condensate drainage hose
Bag containing hardware (assembly kit):
- 2 wood screws
- 2 wall plugs 10 x 60 mm
- 2 washers
- 1 seal
- 1 crimp connection
Tool for the gas valve
Bag with printed documents:
– Installation and maintenance instructions
– Operating manual
– Installation instructions, air/flue gas duct
system
- Installation template
- Miscellaneous stickers