Assembling Door To Cabinet; Installation - U-Line 2000 SERIES Install Manual

2000 series; refrigerator / freezer; beverage centers; wine captain models
Hide thumbs Also See for 2000 SERIES:
Table of Contents

Advertisement

TOP OF
OVERLAY
6. Use the door frame holes as a guide to drill pilot holes for the
#6x1" pan head screws
#6 x 1" Pan Head Screws
Top Of Panel
(10 Total)
Depending on installation
bottom of overlay may NOT
align with bottom of door
7. Attach the door to the overlay using #6x1" wood screws.
IMPORTANT
IMPORTANT
If you decide to drill pilot holes, remove the wood overlay
from the door, and do not use a drill larger then 7/64". Be
sure not to drill deeper then 3/8". The door frame and
wood overlay must be aligned properly or the door will
not operate correctly.
Note: After attaching the wood to the door, double check the
bottom pivot hole location. If the hole in the pivot bracket is
covered by any wood, chase through the hole with a 11/32" drill to
open hole in door panel. DO NOT drill deeper than 1/4".
DOOR FRAME
TAPE
BOTTOM OF
OVERLAY
ULIN_0418_A
Tape

Assembling Door To Cabinet

8. Starting at the corners and working toward the center, push the
door gasket back into place. Make sure the gasket is fully seated
on all four sides and corners.
9. Check the closure assembly on the bottom hinge to be sure it is
seated correctly in the bosses in the hinge.
10. Position door over closer. Be sure the door hinge plate holes
align with the bosses on the closer (see below). Failure to do so
will result in the door not sitting in the proper position and door
will not align correctly. (Sometimes it is helpful to open the door
180° to have the closer and pivot align correctly).
11. Holding the door in the closed position, install the pivot post
through the top hinge into the top pivot plate. Tighten securely
with a Phillips screwdriver, making sure post is seated fully.
12. Adjusting the door as needed.
Overlay Frame
Door closers
16

Advertisement

Table of Contents
loading

Table of Contents