Using the vacuum pump
1. Completely
tighten the flare nuts,
A, B, C, D, connect the manifold
valve charge hose to a charge port
of the low-pressure
valve on the
gas pipe side.
2. Connect the charge hose
connection
to the vacuum pump.
3. Fully open the handle Lo of the
manifold
valve.
4. Operate the vacuum pump to
evacuate. After starting
evacuation,
slightly loose the flare
nut of the Lo valve on the gas pipe
side and check that the air is
entering (Operation noise of the
vacuum pump changes and a
compound
meter indicates
0
instead of minus)
5. After the evacuation
is complete,
fully close the handle Lo of the
manifold
valve and stop the
operation
of the vacuum pump.
Make evacuation
for 15 minutes or
more and check that the
compound
meter indicates
-
76cmHg (qxl0
Pa).
6. Turn the stem of the packed valve
B about 450 counterclockwise
for
6-7 seconds
after the gas coming
out, then tighten the flare nut
again. Make sure the pressure
display in the pressure indicator
is
a little higher than the atmosphere
pressure.
7. Remove the charge hose from the
Low pressure charge hose.
8. Fully open the packed valve stems
B and A.
9. Securely tighten the cap of the
packed valve.
Indoor unit
Outdoor unit
Manifold valve
-76cm/Hg
Charge hose
Hancle Io
handle hi
_
Charge
hose
Vacuum pump
Electricel
sefety
Check the electrical safety before finalizing the installation.
1. The insulation
resistance
must be higher than 2Q.
2. Grounding..After
completing
this step, measure its resistance with a tester.
Confirm that the grounding
resistance
is lower than 4t_.
3. Check for electrical
leaks (complete this step during the startup test). During
the test operation,
performed
after completing
the installation,
use an electric
tester and a multimeter
to check for electrical
leaks. Unplug the unit
immediately
if any leakage is detected.
Revise and determine
the necessary
solutions
until the unit is operating
perfectly.
Gas leek
control
Leak detector
Use the leak detector to determine
whether there is any leakage.
Water and soap method
Apply a solution of water and soap or
neutral liquid detergent
to the indoor
unit connection
or outdoor unit
connections
with a soft brush to check
for leaks in the connection
points. If
bubbles appear, the tubes are leaking.
indoor
unit
_ H
II
control
point
_u
Cover
y!
A=
Lo valve
B = Hi valve
C & D are the inddor
unit
connection
ends

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents