Echo SHRED ‘N’ VAC ES-250 Operator's Manual page 14

Hide thumbs Also See for SHRED ‘N’ VAC ES-250:
Table of Contents

Advertisement

ASSEMBLY
2. Align locking ribs (A) on elbow pipe with recesses (B) in fan
case. Assure short locking rib (C) faces downward. Slide
elbow pipe into fan case until a clicking sound is heard.
3. Place debris bag opening over flared end of elbow (D), and
cinch bag securely with Velcro strap (E).
14
ES-250
B
A
C
D
E
X7501182803
© 03/2013 ECHO Inc.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents