Download Print this page

Velodyne SubContractor SC-IF Installation Manual page 6

In-floor/in-ceiling subwoofer subcontractor series
Hide thumbs Also See for SubContractor SC-IF:

Advertisement

Step 3 -
Determine and mark grille location. From the centerline of the subwoofer driver, mark off the
dimensions of the grille opening to accommodate the decorative grille chosen for the end user
installation.
Step 4 -
Prepare the installation location.
Make whatever modifications are required to enable the
subwoofer to fit in the installation location. Note that the SC-IF/IC is designed for joists on 16"
centers. Install spacer studs as required to accommodate this dimension.
Step 5 -
Attach the mounting brackets. Attach the mounting brackets to the cabinet as indicated in
step 2.
Figure 2: Mount brackets on subwoofer cabinet.
.
w w w . v e l o d y n e . c o m
3
SC-IF/IC User's Manual

Advertisement

loading

This manual is also suitable for:

Subcontractor sc-ic