Test Procedure (Positive Current Compliance); Test Procedure (Negative Current Compliance) - HP E1328A Service Manual

4-channel d/a converter
Hide thumbs Also See for E1328A:
Table of Contents

Advertisement

Test Procedure
(Positive Current
Compliance)
Test Procedure
(Negative Current
Compliance)
26 Verification Tests
1. Set three jumpers on each channel to the I position
2. Connect source and HP 3458A to Channel 1 (see Figure 4-2)
3. Set non-cal mode on Channel 1 with CAL1:STAT OFF
4. Set Channel 1 max output (+24 mA) with CURR1 MAX
5. Set DC source to + 12.0V and measure channel output (in mA)
6. Increase DC source output by +0.5V and measure channel output (in mA)
7. Repeat step 6 until channel output is 90% of max (21.6 mA). If the
SOURCE voltage is 13.0V when the output decreases to 90% of max, the
test passes.
8. Repeat steps 2 through 7 for Channels 2, 3, and 4. (Use CALchan:STAT
OFF and CURRchan MAX.)
9. Remove power and disconnect test equipment
1. Set three jumpers on each channel to the I position
2. Connect source and HP 3458A to Channel 1 (see Figure 4-2)
3. Set non-cal mode on Channel 1 with CAL1:STAT OFF
4. Set Channel 1 min current output (-24 mA) with CURR1 MIN
5. Set DC source to -12.0V and measure channel output (in mA)
6. Increase DC source output by -0.5V and measure channel output (in mA)
7. Repeat step 6 until channel output is 90% of min (-21.6 mA). If the
SOURCE voltage is -13.0V when the output decreases to 90% of min, the
test passes.
8. Repeat steps 2 through 7 for Channels 2, 3, and 4 (use CAL chan:STAT
OFF and CURR chan MIN)
Chapter 4

Advertisement

Table of Contents
loading

Table of Contents