Installation of the Model 3010PAC Analyzer includes:
1. Unpacking, mounting, and interconnecting the Control Unit and
2. Making gas connections to the system
3. Making electrical connections to the system
4. Testing the system.
3.1
The analyzer is shipped with all materials needed to install and prepare
the system for operation. Carefully unpack the Analysis Unit and inspect it
for damage. Immediately report any damage to the shipping agent.
3.2
The analyzer should be installed in an area that is sheltered from the
elements. In areas where the ambient temperature is expected to drop
below 0°C, auxiliary heating must be provided.
Install the probe with a suitable sample system in an area that is
protected from the elements and from possible RFI. The temperature
limits are the same as those specified for the sensor, but you can obtain
better accuracy if the temperature is held constant. The sample system
must be such as to provide a suitable flowrate of approximately 1000ml/
minute at a constant temperature. Also, the sample system should include
some means of introducing a span gas.
Three outline diagrams are included among the drawings at the rear of
this manual. The diagrams show the location and identification of the
electrical conduit connections, as well as the physical dimensions of the
separate units that comprise the analyzer.

Installation

the Analysis Unit

Unpacking the Analysis Unit

Mounting the Analysis Unit

Teledyne Analytical Instruments
Part II: Analysis Unit
Part II:
3-1

Advertisement

Table of Contents
loading

Table of Contents