Figure 1: Installation Clearances And Clearances To Combustibles - Roberts Gorden Combat 150 Installation & Operation Manual

Uha-series tubular unit heaters (standard range)
Hide thumbs Also See for Combat 150:
Table of Contents

Advertisement

COMBAT
®
UHA U
H
NIT
EATER

Figure 1: Installation Clearances and Clearances to Combustibles

* Recommended mounting height varies with heater input.
Heaters may be mounted at a higher level if destratification
fans are installed.
Note: Venting directly from top of heater not applicable
on Models 150 - 400.
The heater must always be installed at least 6' (2 m) above the floor.
The vent pipe must have clearance from combustibles by 2" (5 cm).
If installed at low levels where individuals can come in contact with hot heat
exchanger components, adequate guarding must be provided.
4
I
O
NSTALLATION
PERATION AND
S
M
ERVICE
ANUAL
Clearance to Vent: 2" (5 cm)
**31" (79 cm) minimum is necessary
for servicing.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents