Condensate Line - Polaris PC 100-34 2NV Installation Instructions And Use & Care Manual

Commercial gas water heater
Table of Contents

Advertisement

Clearances and Accessibility
Notice: Minimum clearances from combustible materi-
als are stated on the data plate located on the front of the
water heater.
The water heater is certified for installation on a
combustible floor.
Important: If installing over carpeting, the carpeting must
be protected by a metal or wood panel beneath the water
heater. The protective panel must extend beyond the full
width and depth of the water heater by at least 3 inches
(7.62 cm) in any direction or if in a alcove or closet instal-
lation, the entire floor must be covered by the panel. The
panel must be strong enough to carry the weight of the
heater when full of water.
Figure 2 may be used as a reference guide to locate the
specific clearance locations. A minimum of 24 inches
(61 cm) of front clearance and 4 inches (10.2 cm) on each
side should be provided for inspection and service.
Figure 2: Minimum Clearance Locations
Back 0" (0 cm)
Sides: 4" (10.2 cm)
Min. for service
Front: 24"
(61 cm )
Min. for service
Sides: 4" (10.2 cm)
Min. for service
Top: 0" (0 cm)
Vent: 0"
(0 cm)

CONDENSATE LINE

Important: Do not run the condensate drain in areas
that are likely to freeze. Frozen condensate will block the
drain line and result in property damage or water heater
malfunction.
Condensate Trap Assembly
A condensate trap/drain stem assembly has been supplied
with the water heater and is located behind the access door
inside the base of the water heater. This assembly must be
installed between the water heater and the exhaust outlet
piping to ensure proper operation of the water heater. To
install, remove the slip-joint nut, stainless steel washer, and
O-ring from the trap assembly. Slip the nut, washer and
O-ring (in that order) over the stainless exhaust tubing and
slide them back near the base of the heater. Insert the trap
assembly over the tubing (see figure 3A accordingly) and
firmly hand-tighten (using a wrench will cause the O-ring to
seal improperly) the nut to form a water-tight seal between
the O-ring and the stainless exhaust tubing. When
tightened, the nut to heater base clearance should be 3/4"
(+/- 1/8") tolerance (1.9 cm +/- 0.31 cm tolerance).
Note: The trap should be aligned so that the exhaust pipe
is in a vertical position close to the surface of the water
heater.
Figure 3A: 2" Condensation Trap Installation
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents