SECTION 1 - ASSEMBLY
INSTRUCTIONS
STEP 8
GRASS TUBE INSTALLATION
A. Attach Tube Handle and Handle Base to Tube
before installing Tube to catcher. Insert (2)
1/4-20 x 3/4" Carriage
bolts through
Handle
Base and holes in Tube as shown. See Figure
1.18. Place Tube Handle over bolts followed by
1/4" Internal Tooth lock washers
and secure
with (2) 1/4-20 hex nuts. Tighten securely. See
Figure 1.18.
HANDLE BASE
TUBE
HANDLE
FIGURE 1.18
B.
Place deck in lowest cutting height setting.
C. Slide upper end of Grass Tube (end without
Handle) into opening in Front Cover Assembly.
D. Slide lower end of Grass Tube over adapter
and rotate towards
mower to secure Handle
Base under Latch. See Figure 1.19.
E. Adjust deck to desired cutting height.
ROTATE GRASS TUBE
TOWARDS MOWER
FIGURE 1.19