Poulan Pro PP8527ESA Owner's Manual page 7

Hide thumbs Also See for PP8527ESA:
Table of Contents

Advertisement

ASSEMBLY / PRE-OPERATION
CHECK TIRE PRESSURE
INSTALL DISCHARGE CHUTE/CHUTE
ROTATER HEAD
(See Fig. 7)
NOTE: The multi-wrench provided in your parts bag may
be used to install the chute rotater head.
1.
Place discharge chute assembly on top of chute base
with discharge opening toward front of snow thrower.
2.
Positionchuterotaterheadoverchutebracket.
If neces-
sary, rotate chute assemblyto align square and pin on un-
derside of chute rotater head with holes in chute bracket.
3.
With chute rotater head and chute bracket aligned,
position chute rotater head on pin and threaded stud
of mounting bracket.
4.
Install 3/8 washer and Iocknut on threaded stud and
tighten securely.
The tires on your snow thrower were overinflated at the fac-
tory for shipping purposes. Correct and equal tire pressure
is important for best snow throwing performance.
Reduce tire pressure to 14-17 PSI.
CHUTE
ROTATER
HEAD
_8LOCKNUT
_8WASHER
CHUTE
PIN
STUD
ROTATER HEAD
MOUNTING
BRACKET
FIG. 7
7

Advertisement

Table of Contents
loading

Table of Contents