Installation
Instructions
Zoneline Air
Conditioners
Questions?Visit
our Website
at: ge.com or call 800.GE.CARES (800.432.2737).
BEFORE YOU BEGIN
Read
these
instructions
completely
and carefully;
• IMPORTANT
- S_ve _ l,,,_,,
inslru< lions for local
insl)ector's
use.
• IMPORTANT
- Ob_,rv< a,
,_()V(_l'l]illg
(od(s
alld
or(lill_)l](
(s.
• Note
to Installer
- Be sure to leave these
illSIrllCliOllS
D,:ilh
[hc
O_*IlCl
",
• Note
to Owner
- Keep
lhese insuuctions for
t?[] [!1 r( , ix,l?el-(llC().
• Prop< r installalion
is the r_ sponsibility
of the
inslall¢ r.
• Product
t_dlme due 1o iml)ropcr
installation
is nol
COY( r(d
t/ll<h
r th(
l_garranty.
TOOLS YOU WILL NEED
Phillipsscrewdriver
Saw
Adjustablewrench
Hammer
Tapemeasure
IMPORTANT ELECTRICAL
SAFETY-READ CAREFULLY
A CAUTION:
• All electrical
connections
and wiring MUST
be
installed
by a qualified
electrician.
• Follow the National
Electrical
Code
(NEC)
and/or
local
codes
and ordinances.
• For personal
safety,
this Zoneline
unit and case
must be properly
grounded.
• Protective
devices
(fuses
or circuit breakers)
acceptable
for Zoneline
installations
are specified
on the nameplate
of each unit.
• Do not use an extension
cord with this unit.
• Aluminum
building
wiring
may present
special
problemsIconsult
a qualified
electrician.
• X_,_en the unit is not rulming
there is still voltage
to
the electrical
controls.
Disconnect
the power
to |he unit before
servicing
by:
1. Removing
the power
cord
(if it has one)
from
the wall receptacle.
OR
2. Removing
the branch
circuit
fuses
or turning
the circuit
breakers
off at the panel.
A
IATA DgTT'_T_
_Jk
VVZ']UL_NJIL±_IU:
B_l_'or_ bcginuing
the
installation,
switch
power
off at Ill( s( r_ice panel
and lock the area
to prevent
pow{r
from
being
switched
on accidentally.
When
the area
cannot
be locked,
secmely
thst_ n a prominent
warning
dexice,
such as a tag, to the smwice panel.
10
Need help?
Do you have a question about the AZ75W18DACM1 and is the answer not in the manual?
Questions and answers