2
SIM information label under door
3
Information label under door
5
Certified label under battery
Following labels need to be peeled off from the old base cover, and need to be put on the new base cover.
1
Windows license label (COA) (only for Windows 7 models)
4
Ethernet label
For some models, you also need to apply one or two FCC labels. Check the old base cover; if it has one or
two FCC labels, find duplicates of them in the label kit and apply them to the new base cover.
For the location of each label, refer the following figure:
2010 LCD bezel assembly
For access, remove the following FRU:
•
"1010 Battery pack" on page 54
84
Hardware Maintenance Manual
1
2
5
4
3