Greenheck IG Installation, Operation And Maintenance Manual page 18

Make-up air unit
Table of Contents

Advertisement

Installation - Evaporative Cooler
Piping (optional)
Evaporative Cooling with Recirculating Pump
Supply Line
Drain Line Valve
(by others)
Drain Line
Recirculating Evaporative Piping
IMPORTANT
All supply solenoids, valves and all traps must be below
the roofline or be otherwise protected from freezing.
IMPORTANT
The supply line should be of adequate size and
pressure to resupply the amount of water lost due to
bleed-off and evaporation. The drain line should be
the same size or larger than the supply line.
CAUTION
Provisions must be taken to prevent damage to the
evaporative cooling section during freezing conditions.
The sump, drain lines and supply lines must be
drained prior to freezing conditions or an alternate
method must be used to protect the lines and media.
1. Install the Water Supply Line
Supply line opening requirements vary by unit size
and arrangement and are field-supplied. Connect the
water supply line to the float valve through the supply
line opening in the evaporative cooling unit. Install a
manual shutoff valve in the supply line.
2. Install the Drain Line
Connect an unobstructed drain line to the drain and
overflow connections on the evaporative cooler. A
manual shut off valve (by others) is required for the
evaporative cooler
drain line. A trap
should be used to
prevent sewer gas
from being drawn
into the unit.
3. Check/Adjust Water Level
Check the water level in the sump tank. The water
level should be above the pump intake and below the
overflow. Adjust the float as needed to achieve the
proper water level.
18
Model IG / IGX Make-Up Air
Supply Line Valve
(by others)
Overflow
Trap
6 in. min.
Drain
6 in. min.
Trap
Evaporative Cooling with Auto Drain and Fill
Supply Line
Sump Overflow
Sump Drain
VALVE C
Sump Drain Solenoid
(by others)
VALVE B
Supply Line Drain Solenoid
(by others)
Auto Drain & Fill Evaporative Piping
IMPORTANT
The supply line should be of adequate size and
pressure to resupply the amount of water lost due to
bleed-off and evaporation. The drain line should be
the same size or larger than the supply line.
CAUTION
All solenoid valves and traps must be installed
below the roof to protect the supply water line from
freezing. If they cannot be installed below the roof,
an alternative method must be used to protect the
lines from freezing.
IMPORTANT
The supply solenoid (Valve A) is NOT the same as
the drain solenoids (Valve B and Valve C). Make sure
to use the proper solenoid for each location. Check
your local code requirements for proper installation
of this type of system.
Auto Drain & Flush Valves
(when provided by manufacturer)
Mfg.
ASCO™
Assembly
Part
Part
Number
Number
Number
461262
8210G2
852178
461263 8262G262
461264
8210G35
Part numbers subject to change.
VALVE A
Supply Solenoid
(by others)
Trap
Drain Line
Solenoid
De-Energized
Diameter
Type
Position
1/2 inch
Supply
Closed
(12.7 mm)
Supply
1/4 inch
Line
Open
(6.35 mm)
Drain
Sump
3/4 inch
Open
(19.05 mm)
Drain
Qty.
1
1
1
®

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Igx

Table of Contents