Ground Wire Connections - Brother DA-9280 Instruction Manual

Three needle (twin needle) feed off the arm double chain stitcher
Hide thumbs Also See for DA-9280:
Table of Contents

Advertisement

5. INSTALLATION
u
y
!1

5-2. Ground wire connections

r
q
e
w
To motor
4
!0
u
i
u
o
y
!2
DA-9280
3. Place the machine head on the table, adjust its posi-
tion in forward and backward directions by aligning it
with the hole for presser bar lifter chain
wise directions by aligning it with belt hole
4. After fastening cushions
pulley cover base with set screws
o
table with screws
* Place the work table so that the machine head is
horizontal.
If the machine head is not horizontal, lubrication will
not be carried out correctly.
5. Connect the presser bar lifter chain
!1
lever
and the presser lifter pedal
Connect the ground wire to the sewing machine head and
motor.
(Use the correct type of ground wire and washer.)
1. Remove lower thread guide holder screw
2. Secure the ground wire
w
with screw
and washer
(The attachment location is indicated by a ground sym-
r
bol
.)
3. Pass the ground wire
4. Connect the ground wire
with the instructions in the instruction manual for the
motor.
y
, and in side-
!0
u
to the machine bed and
i
, fix them to the
.
y
to the knee lifter
!2
.
w
.
q
to the sewing machine head
e
.
q
through the hole in the table.
q
to the motor in accordance
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents